Kenan KAYA

Kenan KAYA

Facade Manager
Kadıköy/İstanbul

Summary

Motivated Facade Manager with 14 years of experience controlling all stages of projects from inception through monitoring and closing, exceeding expectations of being on time and on budget. Considerable client-facing project experience has driven commitment to customer satisfaction.

Overview

14
14
years of professional experience
30
30
years of post-secondary education
2
2
Languages

Work History

Facade Manager

Doğuş Group
Istanbul
07.2019 - Current

Reporting to Executive Managers, to plan, manage, and monitor the design, authorities approval, contractor shop drawings review, and construction of facade works: managing facade consultant and facade contractor performance to ensure design and authorities approval progress is synchronized and in accordance to project development timeline; monitor contractor shop drawings and materials submission progress, and factory production and site installation, to ensure work is executed according to specifications, schedules, budgets, quality, safety and compliance requirements.

Site Project Manager

Aden Metal Façade and Roof Systems
Istanbul
10.2018 - 04.2019

Worked as Site Project Manager at Aden Metal, which is the facade works contractor in Büyükyalı Real Estate Project belonging to Ozak Group.


  • Ensured effective and efficient project management for facade/ curtain wall cladding works, including overall project planning and monitoring of safety, quality, fabrication / manufacture construction, finishing and statutory submissions as well as financial aspects of the relevant work processes;
  • Collaboratively working with construction contractors to ensure that planning and budget requirements are met;
  • Ensuring project requirements are incorporated into areas of contractors design and accurately reflect the clients design intent, drawings and specifications; and
  • Proactively identifying design and construction defects, investigating alternatives with designers and contractors and liaising with project stakeholders to provide effective solutions.
  • Experience in management of large scaled facade design, fabrication, installation and site supervision of other works related.

Facade Works Design Manager

Çuhadaroglu Aluminum Systems
Istanbul
10.2017 - 05.2018

Worked as the Facade Works Design Manager at Cuhadaroglu Aluminium, which is the facade works contractor in the Turkuaz Media Center Project belonging to Zirve Group.

  • Managing Design Team to carry out necessary facade design works.
  • Organizing and planning design works to meet construction schedule.
  • Provide leadership and manage crew in a professional manner, e.g., allocation of work, providing guidelines to them in drafting to maintain the quality, improving productivity, checking drawings and cutting list of profiles etc.
  • Ensure design, drawings, and all other deliverables to meet the standard project requirements, specifications.
  • Identify additional works/variations and convey them to the Project Manager / Contract Manager for processing/approvals required.
  • Corrdination between Design Team, Consultants, Main Contractor and other contractors.
  • Participate in workshops and lead, review and comment of shop drawings in terms of constructability, sequencing and ensure quality of the design is maintained thoroughly.
  • Manage the design change process to ensure minimal impact to project schedule and minimize cost impacts.
  • To resolve any unforeseeable defects throughout the various design phases.

Facade Works Site Project Manager

Çuhadaroglu Aluminum Systems
İstanbul
03.2017 - 12.2017

Worked as the Facade Works Site Manager at Cuhadaroglu Aluminium, which is the facade works contractor in the Queen Central Park Project belonging to Sinpaş Group.


Aplication Area: 42.000 m2, 48 storey building

Scope of Works

Aluminium Unitized Panel System, Curtain Wall Aluminium Stick System, Aluminium Joineries, Glazed Railling System, Perforated Clading and Office Partition Systems.


Job Description:


  • Ensuring that the works are undertaken in strict accordance with all HSE legislations
  • Chairing regular facade meetings
  • Collaborating extensively with in-house design teams, factory design teams, factory manager, logistics manager, foremen, surveyor, and monitoring facade performance testing processes
  • Managing all on site and off site testing processes
  • Ensuring diligent QA procedures are in place for the whole facade package and adhered as well.
  • Supervising the chain of custody ensuring that all required finishes are in accordance with project specifications and contract, and to ensure all tested thoroughly.
  • Planning and programming
  • Dimensional checks
  • Ensuring that deadlines are met by liaising with sub-contractors and the Project Manager.
  • Responsible for all logistical and transport interfaces together with associated factory visits

Facade Works Chief

Çuhadaroglu Aluminum Systems
Istanbul
04.2014 - 03.2017

Job description:

Worked as the Facade Works Chief at Cuhadaroglu Aluminium, which is the facade works contractor in the Torun Center Project belonging to Torun Group.

Construction Date: 2017

Project Location: Istanbul/Turkey

Architect: Emre Arolat Mimarlık

Contractor: Torunlar GYO A.Ş.

Application Area: 50.000 m2, 36-storey office tower

Scope of work: Aluminium Stick System Curtain Wall and Aluminium Unitized Panel System Curtain Wall were preferred in Torun Center Project, designed for mixed use, equipped with features that can meet all the demands of modern life.

  • Ensuring that the works are undertaken in strict accordance with all HSE legislations.
  • Chairing regular facade package meetings
  • Collaborating extensively with in-house design teams, factory design teams, factory manager, logistics manager, crane coordinators, foremen, surveyor engineers for dimensional controls, and facade testing institutes.
  • Ensuring diligent QA procedures are in place for the whole facade package and adhered as well.
  • Planning and programming
  • Ensuring that deadlines are met by liaising with sub-contractors and the Project Manager.

Facade Works Site Manager

GC Facade and Roof Systems
Istanbul
11.2011 - 06.2013

Worked as the Site Manager at GC Facade Aluminium, which is the facade works contractor in the Nissa O2 Residence Project belonging to Nissa Group.


Nissa O2 Residence Project is constructed by the Austrian-Turkish JV, built by Nissa Construction.

Nissa O2 Residence is located on an area of 1.200 square meter, having 600 sqm in and outdoor swimming pool, relaxing areas, restaurant, café, sauna, fitness center, and play grounds.


Company: Nissa Construction

District: Basaksehir

Land Area: 18.255 sqm


Job description :


  • Ensuring that the works are undertaken in strict accordance with all HSE legislations and plans.
  • Chairing regular facade meetings.
  • Collaborating extensively with inhouse design teams, factory design teams, factory manager, logistics manager, foremen, surveyor, and monitoring facade performance testing processes
  • Managing all on site and off site testing processes
  • Ensuring diligent QA procedures are in place for the whole facade package and adhered as well.
  • Supervising the chain of custody ensuring that all required finishes are in accordance with project specifications and contract, and to ensure all tested thoroughly.
  • Planning and programming.
  • Dimensional checks.
  • Ensuring that deadlines are met by liaising with sub-contractors and the Project Manager.



Facade Works Site Chief

Özko Aluminum and Facade Systems
Ankara
12.2009 - 10.2011

Worked as the Facade Works Site Chief at Ozko Aluminium, which is the facade works contractor in Ankara Yenimahalle Nazım Hikmet Culture Center Project belonging to Demars Construction.


Investor: Municipality of Yenimahalle

Architect: Atölye E Architecture

System Applications: Aluminium Curtain Wall - Aluminium Composite Facade Cladding (14.000 m²)


Job Description

  • Managing project from precontract to construction and handover.
  • Directing contractors on their roles and responsibilities with regard to HSE procedures.
  • Overseeing and directing construction projects from conception to completion.
  • Reviewing the project in-depth to schedule deliverables and estimating costs.
  • Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations.
  • Coordinating and directing construction workers and subcontractors.
  • Reviewing work progress on daily basis.
  • Preparing internal and external reports pertaining to job status.
  • Planning ahead to prevent problems and resolve any emerging ones.
  • Negotiating terms of agreements, drafting contracts and obtaining permits and licenses required.
  • Evaluating, managing and mitigating risks.
  • Ensuring quality construction standards and using appropriate construction techniques.
  • Ensuring that structural work is executed as per the approved drawings and in line with drawings/amendments issued by the Client.
  • Ensuring all civil works are ready and undergone complete QA/QC procedure before steel structure being erected.
  • Planning and directing site activities to mitigate delays.
  • Ensuring completion and testing carried by other disciplines (MEP, ICT etc.) before starting fine finishing works.



Facade Works Specialist

Özko Aluminum and Facade Systems
Kocaeli
06.2007 - 12.2009
  • Undertake the design, engineering and documentation, provide specialist input, resolve technical problems and ensure quality of products and services on projects undertaken by the team;
  • Work closely with the Team Leader or Project Leader on all technical matters relating to the projects;
  • Assist the project teams with all aspect of project implementation, including but not limited to site and factory inspection, quality, audits, reports preparation, etc
  • Responsible for checking the quality and accuracy of works
  • Represent the team/group/profession/discipline at external meetings
  • Undertake liaison and coordination with other designers, including architects, and other consultants
  • Use computer-assisted engineering and design software and equipment to prepare facade engineering design documents (LOGICAL)
  • Research design options and document findings
  • Demonstrate capability and experience in managing and performing projects in a fast paced environment

Education

High School Diploma -

Incesu Anatolian High School
Çankaya/Ankara
09.1998 - 06.2022

Bachelor of Science - Metallurgical And Materials Engineering

Kocaeli University
Kocaeli/Turkey
09.2004 - 12.2010

Skills

  • Lean manufacturing and design
undefined

Software

  • Microsoft Office Programmes
  • Aconex
  • Logical
  • Autocad
  • 3D Max Studio
  • Logo Tiger
  • Adobe Photoshop

Timeline

Facade Manager

Doğuş Group
07.2019 - Current

Site Project Manager

Aden Metal Façade and Roof Systems
10.2018 - 04.2019

Facade Works Design Manager

Çuhadaroglu Aluminum Systems
10.2017 - 05.2018

Facade Works Site Project Manager

Çuhadaroglu Aluminum Systems
03.2017 - 12.2017

Facade Works Chief

Çuhadaroglu Aluminum Systems
04.2014 - 03.2017

Facade Works Site Manager

GC Facade and Roof Systems
11.2011 - 06.2013

Facade Works Site Chief

Özko Aluminum and Facade Systems
12.2009 - 10.2011

Facade Works Specialist

Özko Aluminum and Facade Systems
06.2007 - 12.2009

Bachelor of Science - Metallurgical And Materials Engineering

Kocaeli University
09.2004 - 12.2010

High School Diploma -

Incesu Anatolian High School
09.1998 - 06.2022