Summary
Overview
Work History
Education
Skills
Software
Key Achievements:
Professional References
Timeline
Generic

Volkan YILMAZ

Project Manager
Uşak/Turkey,64

Summary

Resourceful Project Manager with 12 years of expertise in organizing business operations, financial oversight and resource management to achieve smooth flow and project operations. Leads procurement of resources including equipment and supplies. Monitors projects by adhering to production schedule and budget, managing production team, identifying problems and providing targeted solutions. Knowledgeable in accounting principles, bookkeeping, budget and financial management.

Project Management on Mining industry over 12 years with experience of basic-detailed engineering, SOW building, contracting, procurement, construction, commissioning and ops.readiness. Solution-driven professional with experience delivering results for a wide range of projects in the mining industry.

Team player who accepts challenges and opportunities to improve performance within the company and myself. I adapt well to change, learn new job functions quickly and enjoy learning or creating processes that improve the working environment and performance. Demonstrated success in effectively supervising multiple people, tasks and nationalities while operating within developing regions.

Overview

19
19
years of professional experience
6
6
years of post-secondary education

Work History

Project Manager

Tuprag Metal Maden a Subsidiary of Eldorado Gold
Usak, Türkiye
05.2018 - 12.2022
  • I held a series of roles with Kisladag Mine in Uşak during the transformation period. Especially in the last 4 years, I was the Project Manager responsible for safety, quality, cost and schedule in a series of very critical projects that ensured the production of Kisladag to reach the desired and profitable level.
  • Managed basic/detail designs, made necessary comments to completed designs as per site specific requirements;
  • Procurement of very critical equipment considering current inventory, preparing equipment specs and design specifications; contractor selecting with following tender procedures, progress claims and payments in timely manner;
  • Managed large scale contractors with totally 500-700 average employees head count with safety, quality and management responsibilities;
  • Leading to commissioning and ramp-up activities with operation teams, observing deficiencies and managing of punch list completions.
  • Executed yearly 35M to 50M USD Growth and 5M to 10M USD Sustaining projects for the company to increase mine life, sustain the production, capacity and lower the production costs.
  • Lead role in the design and implementation of a successful safety incentive program for the construction activities. The construction program achieved +2M hours lost time injury free, and several million hour injury free milestones.
  • Made necessary feasibility evaluations, made and discuss necessary trade offs with internal return rates, evaluated with internal steak holders, close contact with executive team in Eldorado making report and presenting in necessary levels.
  • Responsible for budgeting and forecasting, expenditure reporting, risk management, status reporting, and execution.
  • Established good communication and working relationships with departments, consultants, government agencies, contractors, suppliers and staff.

Mechanical Superintendent

Tuprag Metal Maden a subsidiary of Eldorado Gold
Usak, Turkey
10.2012 - 05.2018
  • I managed several significantly high cost projects and many small size construction projects with reporting to Project Manger. Responsible for safety, quality, cost and schedule in a series of very critical projects that sustain the Mine Life.
  • Procurement of mechanical equipment considering current inventory, preparing equipment specs and design specifications;
  • Preparation of tender documentation for execution of tender procedures following the progress claims for contractors and suppliers
  • Coordinating engineering requirements between site and engineering office and ensuring strong interaction within the civil, structural, electrical and process departments.
  • Assisting the contractors with clarification, interpretation, interference resolution and QA/QC related matters
  • Responding to and processing contractor's requests for information (RFIs)
  • Reviewing and approving QA/QC non-conformance reports (NCRs)
  • Ensure instructions, drawings and specifications for scope changes are issued in a timely manner
  • Developing and maintaining communication channels with internal clients, stake holders, and internal project personnel to ensure that work flows smoothly and is delivered to internal customer's expectations
  • Proactively working with contractors to ensure project safety, quality, schedule and cost objectives are being achieved.
  • Monitoring construction activities with respect to performance, procedure, and quality.
  • Submitting weekly progress reports outlining items of concern such as safety observations, non-conformance with specifications and drawings, equipment and weather delays, congestion, workmanship, quality control and potential contract extras.

Project Coordinator & QA/QC Superintendent

Applus+ Velosi
Izmir, Turkey
09.2009 - 09.2012

Efemcukuru Gold Mine Izmir

  • Along to first two months I have done manufacturing inspection of the Kashagan Project which is belong to AGIP CO. and manufacturing by Yamanlar Co. in Ankara as a second party QA/QC. It was 600 tons painted steel structure and manufactured three (3) different workshops.
  • I have started to inspection of the Efemcukuru Gold Mine Project owned by Eldorado Gold and include manufacturing and site works of approximately 1.700 tons of painted steel structure which is subcontracted by local suppliers. Shop inspections; material certifications, quality assurance procedures, the Performance of Welders and Welding Operators, Welding Procedure’s, inspection of; welding activities; follow up the welder’s performance, Evaluation of; NDT results, dimensional inspections, check of the compliance to the project drawings, painting and blasting applications, approval of Quality Documentation.
  • Installation Supervision of Underground and overground crushing, conveying, milling, flotation and piping services installations.
  • Inspection of site works, loading controls, dimensional checks, torque checks, check of the compliance to the Project drawings.

QA/QC Manager

Kellogg Brown & Root (KBR)
Mersin, Turkey
02.2009 - 09.2009

Inspecting the infrastructure and technical goods purchased for US Army by KBR and delivering by the sites according to purchase orders to the Mersin Agility Warehouse. Managing deliveries of the items to the US Army sites in Iraq and Afghanistan.

Project and Engineering Manager

Ates Celik (ateswindpower)
Izmir, Turkey
05.2007 - 02.2009
  • Evaluated project requirements to identify and mitigate risks.
  • Evaluate customer orders as a project; Coordinate and Control them from the offer step to delivery, Coordinating material list preparation, material orders, manufacturing and packing steps. Preparing time schedule and directing to manufacturing steps according to the schedule. Relations with customers for all steps of ordering, manufacturing and delivery.
  • Establish goals for production, and coordinate a plan to meet those goals
  • Ensure production stays on schedule
  • Assure products meet quality standards
  • Write production reports for executive team and customers.
  • Analyze production data and optimize for efficiency.
  • Direct an efficient layout of equipment and flow of materials
  • Ensure workers and equipment meet performance and safety requirements
  • Watch for hiccups in the process, and look for opportunities to improve operations
  • Hire, train, and assess the performance of workers
  • Support workers as questions, concerns, or feedback arises
  • Supervise staff and delegate tasks to employees.
  • On early year as QA/QC Manager; Managed and Coordinated certifications of ISO 9001:2000, ISO 3834-2 and DIN18800-7 class E with supervision of 3rd party companies; Preparing QC plan( or ITP) before project starts and according the QC plan checking incoming materials, their certificates, dimensional inspections of row materials, welding visual inspections, organizing destructive and nondestructive testing and also evaluating the results in the company.

NDT Engineer

Erma Teknik NDT & Heat Treatments Co.
Izmir, Turkey
12.2006 - 05.2007
  • Reviewed, evaluated and identified requirements for testability.
  • Analyzed test results and prepared system-level evaluation reports to verify and validate system performance.
  • Created comprehensive test plans, test scripts and use cases to support testing objectives.
  • Engaged internal and external customers during planning and test phases to answer questions.

Site Admin & QA/QC & Documentation Engineer

Granite Services Inc. GE Field Services
Izmir, Turkey
05.2004 - 12.2006
  • Assigned as Site Administrator on behalf of General Electric Co.
  • Oct’06 –Dec’06 Baymina CCPP 2x9FA Major Outage Ankara & Jun’06 –Oct’06 UCH CCPP 3X9001E Major Outages Pakistan
  • Arranging work sequence on site with 400 head count multi national employees; Collect craft labor times against predetermined project activities, Preparation time sheets all staff.
  • Assigned as GE Installation & Field Services QA/QC Rep. & HSE Advisor
  • Apr’04 – Dec’05 AK Enerji Kamalpaşa CCPP Construction 206C
  • 2 each 40MW GENERAL ELECTRIC 206C Gas Turbine Changing Rotor. Responsible for material marking, Preparation of all quality documents, as-built drawings of systems and equipment, Moreover, Constituting HSE documentation for the company.
  • 2 each 40MW GENERAL ELECTRIC 206C prototype Gas Turbines and 1 each 40MW GE Steam Turbine Construction as a QA/QC Assistant Engineer Responsible for Preparation of all quality documents, as-built drawings of systems and equipment, Leading and responsible for pre-commissioning, commissioning and hand over of systems to Client in accordance with contract conditions, Coordination of the NDT and PWHT activities Organization of the welder tests in acc. with ASME Sec.IX under supervision of QA&QC Manager; Moreover Constituting HSE documentation and conditions for the company.

Education

Bachelor of Science - Mechanical Engineering

University of Gaziantep
Gaziantep
09.1998 - 02.2004

International Welding Engineer - Welding Engineering

GSI SLV
Ankara
12.2012 - 04.2013

Skills

    Advanced problem solving

Software

MS Project

AutoCAD

Primavera P6

Key Achievements:

  • HPGR Project: Designed, procured, constructed and commissioned of World’s highest capacity HPGR (4000-tons/hr) as brownfield project on schedule and under budget of 37M-USD value; project has executed with no lost time injury and successfully, extended the mine life 15-more years with increasing recovery significantly above the model recovery. All designs have done with local resources.
  • Heap Leach Pad: Designed 2 Million m2 Heap Leach Pad with 200M Tons of ore stacked volume with overseas resources; Procured and constructed 650K m2 leaching area with 20M tons of ore capacity including Process Ponds, Solution Pumping/piping System, CIC trains, Overland Conveyors and Stacking Equipment, Power Lines and infrastructures.; 35M USD project that sustain the mine life beyond 15 more years.
  • Interlift Liners: Designed , procured, constructed and commissioned 1.2M m2 of interlift leach pad, achieved sustaining production during a 5 years period with 15M USD budget.
  • Stacking Equipment: Managed designs, procurements and fabrications of 2800 tons/hr capacity heavy duty stacking equipments, Radial Stacker, Horizontal Stackers and multiple Mobile Conveyors with in country resources in the budget of 5M USD.
  • Pond Construction: Designed, permitted and constructed various sizes process ponds, the largest one was 420K m3, completed in a challenging duration and cost saving 20%, 3.2M USD.
  • CIC Trains: Designed , procured, constructed and Commissioned of 4M USD worth project in a timely manner and under budget.
  • Sodium Cyanide Cure: High concentrate NaCN Solution adding system to Fine Ore on stacking equipment first in the country; design, construct and commission in a timely manner. Significant production increases and cost saving in production.
  • SLS Filling: NaCN bags to fill the tank system safely. first in the country; design, construct and commission in a timely manner. Significant cost saving in procurement.
  • Agglomeration: 700Tons/hr capacity fine ore agglomeration project designed, procured and construction started. 2600tons/hour capacity full agglomeration basic designs completed with overseas resources.
  • ADR plant: Mass and Metallurgical balances, sizing 2x8 tons stripping gold room preliminary designs completed, scope of supply done and purchase order completed.

Professional References

  • Matt Badylak - Galia Gold President & CEO - M: +1 604 230 0786
  • Brock Gill- Eldorado Gold SVP (Projects & Transformation) M: +1 604 360 4380 - E-mail: brock.gill@eldoradogold.com
  • Andrew McGowan - Asanko Gold Ghana General Manager - M: +233 50 956 3189 - E-mail: andrew.mcgowan@asanko.com
  • Justin kapla - Tuprag Metal Maden Kısladag Gold Mine General Manager - M: +90 549 749 9871 - E-mail: justin.kapla@tuprag.com

Timeline

Project Manager

Tuprag Metal Maden a Subsidiary of Eldorado Gold
05.2018 - 12.2022

International Welding Engineer - Welding Engineering

GSI SLV
12.2012 - 04.2013

Mechanical Superintendent

Tuprag Metal Maden a subsidiary of Eldorado Gold
10.2012 - 05.2018

Project Coordinator & QA/QC Superintendent

Applus+ Velosi
09.2009 - 09.2012

QA/QC Manager

Kellogg Brown & Root (KBR)
02.2009 - 09.2009

Project and Engineering Manager

Ates Celik (ateswindpower)
05.2007 - 02.2009

NDT Engineer

Erma Teknik NDT & Heat Treatments Co.
12.2006 - 05.2007

Site Admin & QA/QC & Documentation Engineer

Granite Services Inc. GE Field Services
05.2004 - 12.2006

Bachelor of Science - Mechanical Engineering

University of Gaziantep
09.1998 - 02.2004
Volkan YILMAZProject Manager