With my sheer hard work and perseverance, I aspire to contribute to the growth of the organization in the best possible manner. With strong orientation towards achievement of goals. I am ambitious to shoulder higher responsibilities in the organization in which I work and advance in my career.
Overview
12
12
years of professional experience
3
3
Languages
Work History
E&I Integration Engineer
Yamata Investment Construction Tourism and Trade A.Ş.
02.2022 - 01.2025
Perform routine surveillance and inspection based on construction activities
Review construction projects, pertaining to electrical and instrumentation activities
Raising non-conformation reports based on project specification (Technical Question Report writing and following – 200 pcs)
Responsible for execution and monitoring of Project plan in the site of electrical activities
Substation and Control Room Panels installation -HVAC system installation (8 Building)
Responsible of Electrical Installation & Inspection activities, These; Electrical Heat Tracing System with Cold and Hot Cable Connection (TH-TS-TL-JB İnstallation) (5120 Point)
Lighting system - Luminaire İnstallation (20W, 40W, 60W, 70W, 100W)/ Projector 120W İnstallation / 230V/12V Double or Single pole Socket outlet/ Lighting Junction box and Isolator Switch İnstallation (2218 point)
Cathodic protection system- Drain Point/Monitoring/Anode/Bonding Test post installation and Thermit Welding (Pipe), Corrosion Coupon, Reference Elektrot, Magnesium Anode, Flexible Anode Cable Pulling and Route İndicator installation (4726 pcs)
Underground and Above ground Earthing System- 40x5mm and 4x25mm Galvanized Strip installation/ E&I Equipment, Cable Tray and Colon connection point installation (28654 point)
E&I Panel/Equipment İnstallation - Push Buttons, Emergency Stop, Trace Heating Distribution and monitoring panel, Aircraft control panel, Room Air Temperature Sensor İnstallation (897 pcs)
Data Socket installation and CAT5 ethernet cable connection
SDS, CONS and CCTV Cabinet installation and connection
TSK, NATO (MIS-WAN) and INT Panel installation and cable connection
Video Matrix Switcher(8x4) installation and connection
Smart board, video wall and projector systems installation
R&D Project Engineer
Kocaeli University Technopark A.Ş.
12.2019 - 06.2021
Atmospheric Plasma project R&D and surface tension test
(https://www.youtube.com/watch?v=WSO6GDFQOp4)
Development of Wireless Inductive Charging System for Electric Vehicles and Establishing a Pilot Plant (It will provide wireless inductive energy transfer between 2 kW and 8 kW capacity.) (2019-2020 KOSGEB R&D Project Writing (3Q7KZ)
Fully Automatic Non-Contact Car Washing Machine Manufacturing (Robotic Arm Full Automatic Remote Controlled Non-Contact Car Washing Machine Manufacturing) 2019-2020 KOSGEB Advanced Entrepreneurship Project Writing (Data Matrix: 3SXK9)
Development Studies for Growing Overseas Market in Exports (ETİEN ENERGY SYSTEMS INDUSTRY) 2019-2020 KOSGEB International Market Project Writing (Data Matrix: 3QY46)
E&I Construction Site Engineer
Gemont Manufacturing Industrial Facilities And Construction A.Ş.
08.2017 - 05.2018
Establish Design procedure, selecting best design approach and Design Criteria
Direct Electrical Coordination, Design Management of iconic projects all around the work site
Direct interface with Client and other Stakeholders to translate the Client's Requirements into a successful design
Follow-up the design process
Searching and managing globally the in-house or subcontracted design teams to achieve design goals in terms of technical quality, deadline, cost
Electronic Heat Tracing System installation with site marshalling and display box
Cathodic Protection for underground pipe installation
Lighting luminaire and 220 Socket installation
Electrical Panel and Equipment installation and Connection