

I have started to work at Turkish Aerospace Industry as a design engineer at 2003. Design Leader, Engineering Leader, Integrated Project Leader are my positions respectively. I am experienced in managing of project from starting to completion. I am experienced in implementation of new technologies to aircraft components. Also I have been working on research and development projects for part production technologies with composites (Thermosets, Thermoplastics, RTM, AFP, stamp forming, Welding, overmoulding etc.). I have deep knowledge at Airbus rules, specifications, processes and applications.
At the end of my 21 years of working life, I think I have the following management skills:
Accomplished professional with extensive expertise in budget management, resource allocation, and strategic planning. Demonstrates proficiency in conflict resolution, effective communication, and cross-functional team leadership to drive project success. Skilled in process improvement, timeline oversight, and risk assessment, with a strong understanding of the project lifecycle and critical path analysis. Adapt at stakeholder engagement, procurement processes, and change management to ensure seamless project execution. Committed to leveraging agile coaching and crisis management skills to deliver innovative solutions while maintaining alignment with organisational goals.
Offering strong leadership qualities and collaborative mindset, bringing valuable experience from coordinating team projects and driving them to successful completion.
Adaptable and driven, with proven ability to lead teams and manage complex projects. Strong communication and problem-solving skills, combined with keen attention to detail and strategic thinking.
Motivated with 21 years of experience, recognised for assessing operational needs and developing solutions to save costs, improve revenues and drive customer satisfaction. Resourceful and well-organised with excellent leadership and team-building record.
Administrative leader experienced in business operations and team oversight. Seeks opportunities to improve processes, procedures and practices. Excels with minimal supervision and decisively approaches problems.
In this project, my responsibilities are listed below:
In this project, my responsibilities are listed below:
Airbus Wing of Tomorrow –Thermoplastic Spoiler
-Thermoplam
This project’s aim to develop thermoplastic aircraft parts in TUSAŞ. Main goal is being capable to design, analyze, manufacture and generate certification dossiers of thermoplastic aircraft parts,
The design and analysis guidelines, the manufacturing specifications and process specifications were prepared during the project according to performed test and manufacturing trails.
-Composite Materials Allowable Generation Project
This project’s aim is to generate design allowables for selected composite materials for using these materials at indigenous projects.
As an Integrated Project Leaders of above mentioned projects, My responsibilities in this project my responsibilities are:
I have worked as an Engineering Leader for Airbus A350-900 project
Responsibilities mainly consisted of;
I have worked as an engineering leader for Airbus A400M project in the Forward Center Fuselage Structural Design Team
Responsibilities mainly consisted of;
I have worked at A400M Forward Center Fuselage Project, Lower shell Design Responsible.
My responsibilities mainly consisted of;
Worked as a member of the A400 Forward Center Fuselage design team
My responsibilities mainly consisted of;
CERTIFICATES RECEIVED AND TRAININGS ATTENDED
Authorized by Airbus as a “Design Task Responsible (DTR)” for A400M Project; September 2007
Authorized by Airbus as a “Design Task Responsible (DTR)” for A350 Project; February 2016
26.04.2004-28.04.2004 Fasteners, Bolt & Nut Familiarization - TAI
23.02.2005-23.02.2005 Engineering Drawing Basic Reading - TAI
15.05.2006-18.05.2006 Primes A400m Execution Course For Def.&Dev. Phase - PRM
08.03.2007-09.03.2007 Full Change Process - AIRBUS
22.08.2007-22.08.2007 Material Procurement - TAI
23.08.2007-23.08.2007 SAP Concession Assessment and Validation - AIRBUS-INFOTEL
11.09.2007-14.09.2007 DTR Awareness Airworthiness - AIRBUS
11.09.2007-14.09.2007 Aircraft Management Rules – AIRBUS
11.09.2007-14.09.2007 Configuration Management Training – AIRBUS
28.09.2007-28.09.2007 SAP DQN - AIRBUS
26.11.2007-28.11.2007 Definition Dossier Training - AIRBUS
07.02.2008-07.02.2008 AP2006 Accepting Non Conforming Items By Concession - AIRBUS
08.02.2008-08.02.2008 AM 2223 Structure Competence Training - AIRBUS
17.06.2008-18.06.2008 CCDM Awareness,Gap Code Analysis Delta AIRBUS
18.12.2008-24.12.2008 Fatigue Damage Tolerance - CAPITAL
16.12.2009-17.12.2009 How To Make Presentations - PDR
10.05.2010-10.05.2010 Team Working - BALTAS
21.06.2010-22.06.2010 Problem Solving And Make Decision - BALTAS
09.11.2010-09.11.2010 E-QSR Awareness Session - AIRBUS
31.01.2011-31.01.2011 Performance Evaulation - TAI
17.02.2011-17.02.2011 E-QSR - AIRBUS
18.02.2011-18.02.2011 How To Make Interview TAI
07.04.2011-07.04.2011 Adhesives - 3M
11.11.2011-11.11.2011 Time Management - TAI
23.11.2011-24.11.2011 CATIA V5 CPD (Composite Part Design) Designer - TAI
20.12.2011-20.12.2011 Process Management - TAI
27.02.2012-27.02.2012 AP2243-Classify & Approve Changes To The Type Design - AIRBUS
16.04.2012-18.04.2012 PDMLINK SSCI Def.Ph.Designer/GL/MUI - EASA
19.04.2012-20.04.2012 VPM A350 Design In Context - EASA
24.05.2012-24.05.2012 Management With Human Character - BALTAS
30.04.2014-30.04.2014 Root Cause Analyse And Corrective Action - TAI
18.06.2014-19.06.2014 Introduction To Structural Analysis - TAI
26.06.2014-26.06.2014 Statistical Process Control - TAI
13.10.2014-13.10.2014 KC&T - TAI
22.10.2014-22.10.2014 ICY - TAI
30.10.2014-31.10.2014 Introduction To Composites Design - TAI
22.12.2014-24.12.2014 MSC Adams View - BIAS Müh.
08.01.2015-09.01.2015 Fatigue And Damage Tolerance – TAI
09.03.2015-11.03.2015 Pre-sizing (For TCT or TMT)
13.05.2015-14.05.2015 TCT Composite Material And Processes
01.10.2015-01.10.2015 Contractual Interchangeability-Airbus
16.10.2015-16.10.2015 Genel Impact Damage On Composites -TAI
09.11.2015-09.11.2015 Empaty-Prof.Dr.Ustun Dokmen
07.12.2015-08.12.2015 Ms Project-MMO
23.12.2015-23.12.2015 Management capability-TAI
09.03.2016-09.03.2016 Technology Readiness Level-TAI
11.03.2016-11.03.2016 Practical Problem solving Metods -TAI
16.08.2016-17.08.2016 Program and Project Management-TAI
06.10.2016-06.10.2016 System Safety Engineering-TAI
18.11.2016- 18.11.2016 Trust Development and Management
07.02.2017- 07.02.2017 Classification for Concessions
28.03.2017- 28.03.2017 Contract Pricing
17.04.2017- 17.04.2017 Advanced Stitched Composite Structures
28.04.2017- 28.04.2017 Introduction to Bearing Selection and Way Forward to A350 Bearing Qualification
15.01.2018- 15.01.2018 Design and Analysis of a Window Frame with RTM Method Assembling to Panel with
Co-Bonding
29.06.2018 -29.06.2018 Design and Manufacturing Projects Bidding Process Engineering Activities (AIRBUS)