Summary
Overview
Work History
Education
Skills
Driver License
References
Timeline
Generic
Osman Cömertoğlu

Osman Cömertoğlu

Civil Engineer
Ankara

Summary

I live by the adage, 'If you're not part of the solution, you're part of the problem.' I believe in integrating patience, respect, dedication, and teamwork with a solution-focused approach. This way, every problem presents an opportunity for a positive outcome. With my experience from projects both at home and abroad, I'm confident in my ability to successfully complete any task assigned to me.

Overview

15
15
years of professional experience
8
8
years of post-secondary education
1
1
Language

Work History

Project Manager

Sarfen Construction ( Nurol Construction)
04.2023 - 04.2024
  • Coordination of finishing works and implementation of construction at the B1070 Radar Test Building, B557 TR Motor Ar&Ge ve Uretim Binası (Research and Development of Fighter Aircraft Engine Building) located in Turkish Aerospace Industries (TAI) in Kahramankazan, Ankara.

Project Manager

Sarfen Construction (Türkerler-Astaldi)
12.2020 - 04.2023
  • Coordination and implementation of finishing works for the Maincore Building (Main Building), T4 Tower (Children's Hospital), and TN Block (Kitchen and Technical Building) structures, along with other disciplines, in the Etlik City Hospital Health Campus project, covering a total of 280,000 square meters of enclosed area.

Construction Manager

Sistem Yapı (Zafer Cons.-Framaco Int.)
07.2019 - 09.2020
  • Completion of infrastructure, insulation, and finishing works at the Port Moresby American Consulate Project, constructed under the partnership of Framaco and Zafer. Ensuring the delivery of tasks to the Overseas Buildings Operations (OBO) and maintaining document controls.

Finishing Works Manager

Orbi Gruop
08.2018 - 04.2019
  • Supervision and coordination of finishing works for Block A at the Orbi City Tower project, located in the tallest complex in Batumi (165m). The project comprises a total of three blocks, including a shopping center, with a total of 10,000 rooms

Finishing Works Manager

Rönesans Consruction (REC)
03.2017 - 08.2018
  • Coordination and implementation of facade , finishing , and the same part of rough construction works administrative buildings which is called the castle (MIT) construction site (New National Intelligence Agency Central Campus). I was responsible for overseeing 80,000 square meters of enclosed area within the project scope.

Finising Works Manager

Polimeks Construction
11.2015 - 12.2016
  • In Turkmenistan's capital city of Ashgabat, as part of the Olympic Village project for the Asian Indoor and Martial Arts Games, I was responsible for overseeing the construction of a 45,000-seat stadium. My duties included coordinating and supervising the finishing works for the stands and spectator circulation areas, as well as ensuring the completion of all PU floor covering and the installation of the steel roof with PTFE membrane covering.

Finishing Works Manager

Polimeks Construction
06.2015 - 11.2015
  • Coordinating and overseeing the finishing works at the largest congress center in Central Asia, located in the Awaza region of Turkmenistan. The project includes two conference halls with capacities of 2000 and 500 people respectively, along with living spaces and offices capable of hosting five different heads of state simultaneously.

Finishing Works Manager

Dekon Construction (MACE Group)
05.2013 - 09.2014
  • Under the project management of MACE Group, the Batumi Black Sea HILTON and Residences project in Batumi, Georgia, entailed the turnkey completion of all finishing works. This included the construction of banquet and meeting rooms, as well as spa and pool areas, for a 234-room facility.

Site Section Chief

Dekon Construction (Akkort Consruction)
5 2013 - 09.2013
  • Construction site of the Haydar Aliyev Foundation Zarife Aliyeva Kindergarten in Baku. Supervised the turnkey finishing works for a 6000 m2 enclosed area and coordinated the completion of 5000 m2 of surrounding infrastructure and landscaping works.

Site Section Chief

Dekon Construction (Pasha Construction-Mace)
10.2011 - 10.2011
  • Completion of turnkey finishing works for restaurants with five different concepts at the Port Baku Tower project, managed by Mace Group, in Baku, Azerbaijan.

Site Engineer

Polimeks Construction
10.2011 - 10.2012
  • Completion of the installation of the Olympic standard track and artificial turf for the football field at the 20,000-seater Ashgabat City Stadium, along with the finalization of landscaping works and the handover of the entire construction site to the management.

Site Engineer

Polimeks Construction
04.2010 - 10.2011
  • Construction of the rough construction at the Baht Kosku construction site in Ashgabat, Turkmenistan, followed by the completion of finishing works and handover to the management. The Baht Kosku project encompasses 59,000 square meters of enclosed area and 39,000 square meters of foundation area, including a covered parking lot, shopping center, hotel sections, and wedding halls.

Site Engineer

Polimeks Construction
09.2009 - 04.2010
  • I involved in the supervision and organization of the rough and finishing construction works for the surrounding buildings at the artificial canal construction site in the Awaza Region. Additionally, I oversaw the construction of lanscaping

Education

High School -

Feyzi Alaaddinoğlu High School
Antalya, 07
09.2000 - 06.2004

Civil Engineer -

Eskişehir Osmangazi Universityuniversity
Eskişehir, 26
09.2005 - 07.2009

Skills

  • Communication & teamwork

  • Analytical Thinking

  • Autocad

  • MS Office

  • Organisation skills

Driver License

B SINIFI

References

  • Haluk Yelliburun, Polimeks İnşaat, 5327781342
  • Mutlu Hayat, Ahsel İnşaat-Özbekistan, 5524352940
  • Seçkin Güçlü Er, Polimeks İnşaat, 5327717875
  • Barış Kızılova, Pplimeks İnşaat, 5323016514
  • Argun Çelikten, İçtaş Gayrimenkul Yatırım, 5435273577
  • Ali Akyüz, Rönesans Holding, 0532 248 04 36
  • Murat Saraloğlu, MR İnşaat, 0533 410 50 96
  • Turgay Erünlü, Rönesans Holding, 0532 930 86 28

Timeline

Project Manager

Sarfen Construction ( Nurol Construction)
04.2023 - 04.2024

Project Manager

Sarfen Construction (Türkerler-Astaldi)
12.2020 - 04.2023

Construction Manager

Sistem Yapı (Zafer Cons.-Framaco Int.)
07.2019 - 09.2020

Finishing Works Manager

Orbi Gruop
08.2018 - 04.2019

Finishing Works Manager

Rönesans Consruction (REC)
03.2017 - 08.2018

Finising Works Manager

Polimeks Construction
11.2015 - 12.2016

Finishing Works Manager

Polimeks Construction
06.2015 - 11.2015

Finishing Works Manager

Dekon Construction (MACE Group)
05.2013 - 09.2014

Site Section Chief

Dekon Construction (Pasha Construction-Mace)
10.2011 - 10.2011

Site Engineer

Polimeks Construction
10.2011 - 10.2012

Site Engineer

Polimeks Construction
04.2010 - 10.2011

Site Engineer

Polimeks Construction
09.2009 - 04.2010

Civil Engineer -

Eskişehir Osmangazi Universityuniversity
09.2005 - 07.2009

High School -

Feyzi Alaaddinoğlu High School
09.2000 - 06.2004

Site Section Chief

Dekon Construction (Akkort Consruction)
5 2013 - 09.2013
Osman CömertoğluCivil Engineer