ÖMER IŞIK

ÖMER IŞIK

Civil Engineer
Muratpaşa,Antalya

Overview

34
34
years of professional experience

Work History

General Manager

Prodius Construction
04.2023 - 08.2024

Project Manager

Maqro Construction
01.2021 - 03.2023
  • Tailing Storage Facilities
  • Tailing Mine Facilities
  • Row Water Facilities
  • Heap Leac Pad 4 Facilities

Project Manager

Gemikaya Company
08.2018 - 12.2020
  • Construction of 48Mw TV regulator
  • T1 Tunnel 948m
  • T2 Tunnel 545m
  • T3 Tunnel 608m
  • T4 Tunnel 348m
  • T5 Tunnel 623m
  • 2
  • 623m Ø680mm Steel Pipe Construction
  • 28.500.00 m3 soft soil excavation
  • 98.60.,00 m3 rocks filling
  • 38.500, m3 concrete
  • Electrical Instrumentation

Project Manager

Gemikaya Company
09.2017 - 07.2018
  • Tuzdağ Tunnel
  • 3344,00 m3 Using of NATM

Project Manager

Gemikaya Company
04.2016 - 08.2017
  • Azerbaijan National Airport Infrastructure Project
  • 943,000.00 m3 rock excavation
  • 345.000,00 m3 rocks filling
  • 41,000.00 tons asphalt surface course
  • 45,000.00 tons Binder
  • 106,000.00 tons of bituminous Basic done
  • 108,000.00 tons lower base is done
  • 216,000.00 tons of crushed stone (0 to 0.80) is done
  • Runway, Apron, Taksiway and ambient lighting manufacturing

Area Manager

ICA Construction
09.2015 - 03.2016
  • Express Highway M11 Moscow-St.Petersburg
  • 8 Km 648-684
  • 6300.000 m3 filling
  • 1500.000 tons of asphalt
  • 18 bridges
  • 130.00 meter tunnel
  • 5 Intersection connection (78 m + 132 m + 124 m + 124 m + 89 m)

Project Manager

Cengiz Holding & IC Ictas Joint Venture
11.2011 - 09.2015
  • Ordu-Giresun Airport Infrastructure Project
  • 7.5 km Breakwater with 11,600,000.00 tonnes (with various categories) rocks
  • 41,350,000.00 tonnes (2,250,000.00 m2 area) filling with rocks
  • Runway, Apron and taksiway special 6,175,000.00 tonnes rocks filling
  • 43000.00 tons SMA
  • 75,000.00 tons Binder
  • 92000.00 tons of bituminous Basic done
  • 143,000.00 tons lower base is done
  • 283,000.00 tons of crushed stone (0 to 0.80) is done
  • Production of 275,000 m3 concrete (concrete apron and drainage)
  • Runway, Apron, Taksiway and ambient lighting manufacturing

High Science Board Member - Minister of Technical Advisor

Ministry of Public Works and Settlement
01.2009 - 01.2011

Cengiz Construction, Inc.
01.2007 - 01.2009
  • Preparing and carrying out the checks of the construction cost of the construction of dam construction ongoing analysis
  • The body of the dam project tender will be made, the cutoff excavation, filling, crest, spillway, bottom outlet, intake and outlet structures, injection, diversion channels, stilling systems and so on
  • All types of manufacturing, electricity, supply of mechanical and electronic equipment / installation preparation of cost analysis and detection, calculation of the tender offer consideration, follow-up and finalization of the tender procedure

Port Survey Project Office

General Directorate of the Ministry of Transport Infrastructure Investments
01.1999 - 01.2007
  • Berth and Channel Hydraulic Electric Steel Cover (-5.00) Meters Depth Pier Construction Project Applications
  • Camburnu Shipyard Building Application Project
  • Zonguldak - Eregli Shipyard Construction preparation of the final project, making the discovery and metering
  • Turgut Reis Marina Alta and Projects Under Construction

General Directorate of the Ministry of Transport Infrastructure Investments
01.1997 - 01.1999
  • Kyrenia Tourism Port Construction
  • 500 mt
  • Depth of -8.00 m in length block Pier construction
  • 1300 m
  • Breakwater construction

General Directorate of the Ministry of Transport Infrastructure Investments
01.1994 - 01.1997
  • Port Construction Office
  • Trabzon Port Repair Construction preparation of the project application
  • Preparation of Construction Bağırganlı Fishing Shelter Implementation Project
  • Sinop-Gerze Fishing Port Construction Project preparation of the application
  • SSI Fethiye and Marmaris Floating Jetty Construction Preparation of the Final Design and Implementation Project, making the discovery and metering

Hydro Power Plants Survey and Planning Engineer

The State Hydraulic Works
01.1991 - 01.1994

Education

Undergraduate Education - Civil Engineering

Yildiz Technical University
Istanbul

Skills

Project and Contract Management

Driver License

  • B, 94
  • A2, 14

Personal Information

  • Date of Birth: 02/11/69
  • Marital Status: Married

Military Status

Completed (04/01/94)

Timeline

General Manager

Prodius Construction
04.2023 - 08.2024

Project Manager

Maqro Construction
01.2021 - 03.2023

Project Manager

Gemikaya Company
08.2018 - 12.2020

Project Manager

Gemikaya Company
09.2017 - 07.2018

Project Manager

Gemikaya Company
04.2016 - 08.2017

Area Manager

ICA Construction
09.2015 - 03.2016

Project Manager

Cengiz Holding & IC Ictas Joint Venture
11.2011 - 09.2015

High Science Board Member - Minister of Technical Advisor

Ministry of Public Works and Settlement
01.2009 - 01.2011

Cengiz Construction, Inc.
01.2007 - 01.2009

Port Survey Project Office

General Directorate of the Ministry of Transport Infrastructure Investments
01.1999 - 01.2007

General Directorate of the Ministry of Transport Infrastructure Investments
01.1997 - 01.1999

General Directorate of the Ministry of Transport Infrastructure Investments
01.1994 - 01.1997

Hydro Power Plants Survey and Planning Engineer

The State Hydraulic Works
01.1991 - 01.1994

Undergraduate Education - Civil Engineering

Yildiz Technical University