Summary
Overview
Work History
Education
Skills
Address
Military Service
Medical Problems
Marriage Status
Personal Information
References
Timeline
Generic
MELİH APAYDIN

MELİH APAYDIN

Mechanical Engineer
Çekmeköy

Summary

More than 10 years of experience and never ending work determination as mechanical department chief in Turkey and abroad, and my career goal is to be a part of helping the construction companies all over the world I work for achieve their corporate goals and to continue my personal development while doing so.

An engineer with advanced analytical skills who has taken an active role in many projects. I contribute to the achievement of the technical goals of the companies I work for, thanks to my search for innovative solutions, my success in teamwork, and my calm and cool-headed characteristics.
In the construction industry where I have worked for many years, I have always aimed to go further and worked in this direction.

With extensive expertise as a mechanical department chief with team management, project design, purchasing, technical office skills, and hand over I can move both myself and the company I work for to better positions.

Overview

17
17
years of professional experience
2
2
Languages

Work History

Mechanical Department Chief

EXCEL SIS ENERJI URETIM LTD
02.2021 - 11.2023

Project: GOZO AQUATIC CENTER
Design: Excel Sis Enerji Uretim LTD
Owner: Ministry for Gozo of the Government of Malta


  • Mechanical department chief for olympic pool sports complex including basketball court, gym and other ancillary facilities with 15.506 m2 construction area
  • Responsible for all phases for project development, design of all mechanical systems including the olympic pool system (with REVIT and AutoCAD), approval of mechanical projects and materials
  • Responsible for procurement all mechanical materials and equipments, application of mechanical projects, in charge of the all mechanical application with leading the mechanical team, drawing of as-builts and handing over to owner.
  • Included mechanical systems are heating and cooling system, fire fighting system, automation system, sanitary system, ventilation system, infrastructure, olympic pool system with moveable floor


Project: HVSC, PROVISION OF A HIGH VOLTAGE SHORE CONNECTION SYSTEM USING ENERGY EFFICIENT EQUIPMENT

Design: Excel Sis Enerji Uretim LTD

Owner: İnfrastructure Malta


  • The project allows cruise liners and cargo ships to switch off their gasoil or heavy fuel oil fired engines and plug in to shoreside electricity to energize their onboard systems while they are berthed in port
  • Mechanical chief engineer for supply, application, drawing as-builts, testing and commissioning of all mechanical works
  • The facility has been completed in 2023 at Valletta Malta


Mechanical Chief Engineer

SYSTEM Construction
02.2017 - 03.2019

Project: SHEIKH KHALIFA HOUBARA BREEDING CENTER

Industrial Design: Reneco & HLD Wildlife Consultants
Mec.& Elect. Design: TAE Engineering LLP -UK

Counselor: Bureau Veritas
Owner: Emirate of Abu Dhabi


  • Mechanical Engineer for 62 800 m2 indoor space over 70 buildings including boiler room with 4500 kW capacity, package type wastewater treatment system, live food production building, central breeding managements, incubation buildings, rearing buildings, management building, warehouses, industrial kitchen, accommodation building, villa and sports center with swimming pool, service buildings
  • Worked with a team of 3 to be responsible for application of mechanical projects, approval of mechanical materials, control and handing over all mechanical systems including heating and cooling system, fire fighting system, automation system, sanitary system, ventilation system and infrastructure
  • Procurement and transportation material control of all mechanical works of $80 million USD
  • Provided technical guidance and support for application team.
  • The Center has been completed in 2019

Mechanical Department Chief

TACA Construction
11.2015 - 09.2016

Project: IPFP İskenderun Park Forbes Turizm Kompleksi

Design: Arketipo Project
Owner: Murat A.Ş.


  • Mechanical chief for tourism complex including 4 storey Shopping Mall, Residence and Hilton Hotel, 2 levels of subterranean car parking
  • Responsible for application of mechanical projects, control and handing over including heating and cooling system, fire fighting system, automation system, sanitary system, ventilation system and infrastructure.
  • Coordinate between the design and application teams to ensure our end production meets a reliably high level of quality
  • The Mall has been completed in June 2016

Mechanical Department Chief

HAZİNEDAROĞLU Construction
06.2012 - 09.2014

Project: Apart Hotel for Sochi 2014 Winter Olimpic Games

Design: Creative Project

Consultant: Sembol İnşaat


  • Mechanical Chief for apart hotel has 55.000 m2 construction area designed for members of olimpic games press members
  • Responsible for application of mechanical projects, control and handing over including Heating and Cooling system, Fire Fighting System, Sanitary System, Ventilation System and infrastructure.
  • The building has been delivered in September 2013


Project: 7* Hotel for Sberbank

Design: Creative Project

Consultant: Sembol İnşaat


  • Mechanical Chief for 7* hotel has 22.000 m2 area designed for president and administrators of SBERBANK
  • Only responsible mechanical engineer for all of mechanical work of 7* hotel including progress payment, procurement, application mechanical projects and handing over
  • The building has delivered in September 2014

Mechanical Chief Engineer

BORA Construction
06.2011 - 03.2012

Project: Argun City , Argun Mosque Project

Design: TMP Team
Client: Chechenya’s Government


  • Responsible for application of mechanical projects, control and handing over of 8 highrise buildings, 1 mosque and 2 underpass
  • Contractor work control for Heating and Cooling system, Fire Fighting System and sanitary system and infrastructure.

Field Engineer & Mechanical Projects

SEMBOL ANAYURT
07.2010 - 03.2011

Desing: Leo A Daly
Consultant: ARCADIS
Value: $ 1,3 billion
Project: Garyounis Univ. Project


  • Mechanical Field Engineer of renovation of six faculties and 13 buildings
  • Responsible for mechanical project approvals and application of new buildings
  • Application responsible & Field Engineer of Mobilization Project, 40000m2 (designed for 3500 persons) including mobilization infrastructure, industrial kitchen, concrete mixplant, ventilation and air conditioning for accommodation buildings.

Project and Technical Support Engineer

FİGES Engineering
03.2007 - 08.2009
  • MİLGEM (Anti-Submarine Warfare and Reconnaissance Patrol Boat Project)
  • MİLGEM Class Corvette , Air Intake and Exhaust Systems , Design and Analysis
  • MİLGEM Class Corvette , Smoke Analysis , Aerodynamic analysis into the Sea


  • ARTHOR
    * Marine Engines , Designing Engine Manifold(Cooling of the Exhaust Gas , trouble- free disposal of gas and behavior of cooling fluid) CFD Analysis
    *Marine Engines , ECOTORK engine (Manifold Heat Exchanger) CFD Analysis *Marine Engines , DURATORK engine (Cooling the Engine with using Sea Water) CFD Analysis


  • CUMMINS INC.
    * Thermal Analysis of Diesel Engine


  • FARBA
    *Thermal Analysis for Automobile Headlights in Design Stage


  • ROKETSAN
    *Military Rocket Project ,Aerodynamic Behaviours of military rockets at specific number of mach and launch angle


  • TUVASAŞ
    *Analysis of Ventilation and Aircondition at TUVASAS railway carriage wagons


  • NUROL TECHNOLOGY
    *Satallite Project , Thermal Simulations Analysis of Radiation


  • TRAKYA CAM
    *FSI analysis of Thermal Forming for automobile windshield

Mechanical Engineer

BURSAGAZ Dağıtım Ticaret ve Taahhüt A.Ş.
06.2006 - 09.2006
  • Worked on Bursa Innercity Natural Gas Distribution Networks Design and Implementations
  • Supervised employees in construction subcontracting firms.

Education

High School Diploma -

Giresun Lisesi
Giresun, Turkey
06.2020

Bachelor of Science - Mechanical Engineering

Uludağ University
Bursa, Turkey
06.2007

Skills

Teamwork and Collaboration

Address

  • Avcıkoru Mah. Avcıkoru Cd. No:35/3 Şile, İSTANBUL
  • Capital Heights Flat 50 Triq Giorgio Borg Olivier IR-RABAT, GOZO, MALTA

Military Service

Completed

Medical Problems

Non

Marriage Status

Married with Bulgaria (EU) citizen

Personal Information

  • Place of Birth: GİRESUN
  • Date of Birth: 02/03/1983
  • Gender: Male
  • Nationality: T.C.
  • Driving License: Yes

References

  • Volkan EKİNGEN, Preject Manager, ESC Construction, +356 9913 2071
  • Şafak YALÇIN, Owner, GENTA Tasarım, +90 532 311 37 37
  • Devrim Fırat ORHAN, Project Manager, J. PORTELLI Projects, +356 9964 6665
  • Taylan ELBASAN, Project Manager, ESC Construction, +356 9965 6778

Timeline

Mechanical Department Chief

EXCEL SIS ENERJI URETIM LTD
02.2021 - 11.2023

Mechanical Chief Engineer

SYSTEM Construction
02.2017 - 03.2019

Mechanical Department Chief

TACA Construction
11.2015 - 09.2016

Mechanical Department Chief

HAZİNEDAROĞLU Construction
06.2012 - 09.2014

Mechanical Chief Engineer

BORA Construction
06.2011 - 03.2012

Field Engineer & Mechanical Projects

SEMBOL ANAYURT
07.2010 - 03.2011

Project and Technical Support Engineer

FİGES Engineering
03.2007 - 08.2009

Mechanical Engineer

BURSAGAZ Dağıtım Ticaret ve Taahhüt A.Ş.
06.2006 - 09.2006

High School Diploma -

Giresun Lisesi

Bachelor of Science - Mechanical Engineering

Uludağ University
MELİH APAYDINMechanical Engineer