Summary
Overview
Work History
Education
Skills
Technical Projects
Timeline
Generic

MEHMET ANIL ARTAN

MINING ENGINEER
Izmir

Summary

Motivated and detail-oriented Mining Engineering graduate from Middle East Technical University (METU) with strong technical background in mine design, mineral processing, and project management. Practical experience in flotation plants, crushing-grinding operations, open-pit operations, and technical reporting. Eager to apply academic knowledge and hands-on experience in real-world mining projects.

Overview

2
2
years of professional experience

Work History

Open-Pit Mine Internship

ELDORADO GOLD (TUPRAG)
07.2025 - 08.2025

- Observed large-scale open-pit gold mining operations.
- Assisted in daily production tracking, mine surveying, and equipment optimization tasks.
- Gained exposure to drilling, blasting, and haulage processes.
- Developed understanding of safety practices and environmental monitoring in open-pit mining.

Process Plant Internship

ELDORADO GOLD (TUPRAG)
09.2023 - 10.2023

-Participated actively in flotation, crushing, grinding, and tailing processes.

-Conducted process monitoring and basic laboratory tests.

-Assisted plant operators in troubleshooting and efficiency improvement tasks.

-Gained practical understanding of filtration systems and process control.

Education

Bachelor in Science - Mining Engineering

METU (Middle East Technical University)
Ankara
04.2001 -

High School Diploma -

Bornova Anadolu Lisesi (BAL)
Izmir
04.2001 -

Skills

  • MS Office
  • Micromine
  • O-pitblast
  • Roc Science
  • JkSimMet
  • Nx Unigraphics
  • Pit optimization & reserve estimation
  • Equipment selection & blasting design
  • Economic evaluation (NPV, IRR, cut-off grade)

Technical Projects

Copper-Zinc  Processing Plant Design — METU Senior Project

  • Designed a flowsheet for copper-zinc processing plant.
  • Developed mass balances, equipment selection (crushers, mills, flotation), and economic analysis.
  • Performed copper and zinc flotation circuit design, including regrind calculations and reagent selection.

Copper-Iron Open-Pit Mine Design (NI 43-101 Standard) — METU Senior Project

  • Conducted pit optimization, mineable reserve estimation, and financial evaluation.
  • Applied equivalent grade model and cut-off grade optimization methodologies.
  • Generated cash flow diagrams, NPV, IRR, and sensitivity analysis.
  • Completed equipment selection for drilling, loading, and haulage operations, considering production capacity and efficiency.
  • Designed blasting patterns optimized for fragmentation, safety, and cost-effectiveness.
  • Developed mine reclamation plans focusing on slope stabilization and post-mining land use.
  • Conducted environmental impact assessments covering waste management, water management, and dust control strategies.

Timeline

Open-Pit Mine Internship

ELDORADO GOLD (TUPRAG)
07.2025 - 08.2025

Process Plant Internship

ELDORADO GOLD (TUPRAG)
09.2023 - 10.2023

Bachelor in Science - Mining Engineering

METU (Middle East Technical University)
04.2001 -

High School Diploma -

Bornova Anadolu Lisesi (BAL)
04.2001 -
MEHMET ANIL ARTANMINING ENGINEER