Overview
Work History
Education
Skills
Timeline
Generic
MEHMET OZKARUL

MEHMET OZKARUL

Electrical Supervisor
Adana

Overview

39
39
years of professional experience

Work History

BCC GROUP Mıngacevır/Baku/AZAERBAYCAN/NEW 1280

Musa KIRC, Apdullah HAR, Hakan KESICI
12.2023 - 04.2025

Position: Electrical Field Mobilization Supervisor

  • Supervision and control of electrical distribution and installation works in both field and office areas
  • Maintenance and repair of general electrical equipment and machinery
  • Inspection and commissioning of electrical/mechanical installations related to cooling systems

ENKA / HIGH-TECH MULTIFUNCTION MEDICAL COMPLEX

Ibrahim KARAAGAC, Bülent Arslan YUREK
05.2019 - 12.2023

Position: Electrical Supervisor

  • Oversaw all electrical mobilization works during the site installation phase, followed by mobilization inspection and continuation with project implementation.
  • Responsible for all electrical works within the scope of mobilization, including transformer, generator, and distribution panels – manufacturing, installation, and maintenance in both camp and site areas.
  • Installation of IT infrastructure systems and wiring.
  • Distribution and termination of fiber and data lines.
  • Execution of project works including general grounding, lightning protection (paratoner), exterior lighting, floor and pipe heating systems (heat tracing).

ENKA - CSS/Tengiz PROJECT

Emre METIN, Emrah INCE, Alper ASTAN, Robert HARRIS
11.2017 - 02.2019

Position: Electrical Supervisor

  • Responsible for all electrical project applications and mobilization setups.
  • Electrical installation and commissioning works in both office and field environments.
  • Generator installation and commissioning.
  • Installation of distribution panels.
  • Maintenance, repair, and sustainability of all systems after commissioning.
  • Container manufacturing and installation works.
  • Installation of project-related equipment.
  • Cabling and cable routing.
  • System adjustment and regulation (reglaj).
  • Finalization and close-out of all project-related electrical works.

ENKA-CSG-2/SALKA PROJECT

Ozgur ASLAN, Muammer KUCRET, Hakan OCAL
01.2016 - 10.2016

Position: Electrical Supervisor

  • All electrical project applications and mobilization setups.
  • Assigned to CSG-2 site after long-term service at CSG-1.
  • Electrical project works for the entire control building within CSG-1 project implementation experience.
  • Fabrication and installation of TAVA supports.
  • Cabling works.
  • Equipment installation.
  • Electrical and pneumatic project implementations for fire, gas, and vacuum systems.
  • Construction and fabrication of sub-distribution tray galleries for after cooler systems.
  • Installation and commissioning of heating field panels.
  • South Caucasus Expansion Project — Electrical Project Applications and Mobile Applications.

ENKA-CSG-1 GARDABANI PROJECT

Umit Feti BINGOL, Emre METIN, Gokhan PORTAKAL
11.2014 - 01.2016

Position: Electrical Supervisor
South Caucasus Expansion Project – Electrical Project Applications and Mobile Applications

  • Performed all electrical project and mobilization applications.
  • Initially worked on site installations at CSG-1 in Georgia, focusing on adapting electrical installations for temporary accommodation units within the village.
  • Installed and commissioned cooling units for temporary dining facilities.
  • Led own team to perform electrical cabling, sub-distribution panel installation, and power supply for all dormitories, offices, dining areas, and camp buildings at the permanent site.
  • Installed and commissioned the clean water system.
  • Installed and commissioned the wastewater treatment system.
  • Installed a 12 km medium voltage (MV) transmission line.
  • Managed cabling, distribution, and maintenance for three transformers, including one outdoor unit.
  • Set up the main electrical distribution room, including generator integration and power distribution.
  • Supervised project team performing tray installations, LV-HV and low current cabling, fiber optics, data, and alarm system wiring.
  • Oversaw mechanical installation of 12 distribution transformers and main switchgear panels within project scope.
  • Installed tray, cabling, and panel works for an 80-meter chimney lighting warning system.
  • Managed site lighting and pole installations.

ENKA-WEST QURNA GAS TREATMENT POW.GEN.-DIST.PRJCT.

Onur KILIT, Mehmet DURGUT, Ilvan ATLI, Ugur ZORLU
11.2012 - 10.2014

Position: Electrical Technician

  • Performed all electrical project applications and mobilization tasks.
  • Installation, repair, maintenance, and mobilization of electrical, data, fiber optic camera, alarm, and air conditioning systems within the Qurna camp area.
  • Installation, repair, maintenance, and commissioning of the clean water treatment system.
  • Installation, repair, maintenance, and commissioning of the wastewater treatment system.
  • Inspection, repair, maintenance, and operational continuity of all electrical machines, tools, and equipment on the worksite.
  • Installation and commissioning of automatic door systems (both mechanical and electrical components).
  • Installation, setup, and commissioning of 25-meter-high lighting poles with elevator systems within project scope.
  • Post-project dismantling of all electrical cabling, panels, generators, and clean/wastewater systems in the camp area.
  • Dismantling of all construction zone facilities, including warehouses, workshops, and all camp buildings.
  • Completion and final delivery of all project-related works.

ENKA/MAJNOON PETROCHEMICAL PLANT

Osman DEMIR, Cetin SAHIN
01.2012 - 10.2012

Position: Electrical Technician

  • Electrical project applications and mobilization works.
  • Repair, maintenance, and troubleshooting of electrical installations in both site and camp areas.
  • Installation and commissioning of electrical machines and equipment.
  • Generator maintenance and installation of distribution panels.
  • Installation of camera, data, and alarm systems.
  • Mechanical and electrical installation of cable tray systems
  • Outdoor lighting installations.
  • Cabling and cable trench termination works.
  • General site grounding and thermal welding.
  • Cable termination processes.

OZ-EL ELEKTRIK

Own Business
03.1999 - 01.2012

Position: Electrical and Plumbing Works – Business Owner
Employer: Self-employed / Independent Contractor

General Electrical and Plumbing Installations, Data Systems, Alarm, CCTV, and Automation Systems for Residential and Construction Areas – Installation, Maintenance, and Repair.

  • Installation, maintenance, and repair of all types of electrical systems.
  • Full electrical, plumbing, and alarm system installations and commissioning for residential buildings, private sector institutions, and public facilities.
  • Installation, commissioning, maintenance, and repair of electrical, data, and UPS alarm systems for all branches of Vakıfbank Çukurova Region.
  • Complete electrical, plumbing, and copper gas pipeline (oxygen-vacuum-nitrogen) systems for Everen Hospital.
  • Turnkey electrical installation projects for public schools.
  • Maintenance and repair of electrical and pool systems for private educational institutions.
  • Installation of CCTV and alarm systems for military zones and industrial factories owned by private organizations.
  • Panel renovation and renewal projects for transformer centers owned by Adana Electric Authority.
  • Electrical refurbishment and rewiring of buildings and hangars inside Adana İncirlik Air Base.
  • Data cabling and termination works in Gaziantep Semi-Open Penal Institution.
  • Setup and commissioning of IT rooms for schools under the Turkish Ministry of National Education.

GONEN SIRKETLER GRUBU

Birol YUVARLAK, Sevki TUFAN
03.1999 - 01.2012

Position: Purchasing and Sales Manager

  • Purchasing and sales of electrical and electronic equipment, tools, and materials for 12 different industrial enterprises operating under the Gonen Group of Companies, including educational institutions, stainless steel cookware and cutlery factories, textile mills, furniture factories, and construction companies.
  • Responsible for all procurement and sales activities of the group, including food-related purchases.

51. PIYADE TUGAYI

Reference Letter
07.1993 - 06.1995

Position: Military Service – General Electrical Supervisor

  • Responsible for the repair, maintenance, and servicing of electrical distribution panels, generators, and equipment in all buildings within the field under the brigade, including Support Company buildings, residential lodgings, and external field areas.

SURTAS MERMER FABRIKASI- Beylikduzu

Bahattin KELES, Cemal KELES, Ali KELES
05.1991 - 04.1993

Position: Electrical Technician

  • Raw Marble Processing Factory
  • Responsible for the repair, maintenance, and troubleshooting of electrical systems in the raw marble processing facility.

ER-NA YAPI SANAYI- BUYUKCEKMECE/GURPINAR

Social Security Records Available Upon Request
11.1988 - 01.1991

Position: Electrical Technician

  • 1800 Housing Unit Project
  • Site electrician duties within the scope of general project applications.
  • Subcontractor supervision.
  • General field electrical works.
  • Building embedded project applications.
  • Equipment troubleshooting, repair, maintenance, and servicing.
  • Panel fabrication and assembly.

) ELTA ELEKTRIK SANAYI VE TICARET AS.-

Social Security Records Available Upon Request
10.1986 - 09.1988

Position: Electrical Technician

  • NATO American Military Airbase
  • Building construction and electrical panel wiring works.
  • Manufacturing, assembly, and electrical panel wiring of hangars.

T.C.D.D.Y. - Turkish State Railways – Seyhan

School Records
02.1986 - 05.1986

Position: Intern – Electrical Technician

  • Completed internship at the maintenance and repair workshop of the State Railways institution after school.

Education

No Degree - Faculty of Business Administration

Anadolu University
Eskişehir, TÜRKİYE
04.2001 -

Skills

    Technical Skills:

  • Diagnosing electrical system faults
  • Reading and understanding technical materials
  • Proficient in using electrical tools and equipment
  • Calibration of pressure, temperature, and current measurement systems
  • Experience in private, government, and public institutions
  • Construction site experience
  • Residential electrical experience
  • Project implementation experience
  • Electrical installations and schematic reading
  • Installation of furniture for construction and office use
  • Installation, maintenance, and repair of main transformers and generator systems
  • Installation, maintenance, and repair of computer infrastructure (network, fiber optic, CAT-5/6)
  • Installation, maintenance, and repair of camera, TV, fire, smoke, and security systems
  • Installation, maintenance, and repair of electrical machines and equipment (kitchen, laundry, etc)
  • Installation, maintenance, and repair of clean water, wastewater, and water treatment systems
  • Industrial control systems
  • Industrial experience
  • Installation, maintenance, repair, and continuity of all electrical equipment and systems
  • Installation of all electrical hardware at construction sites
  • Knowledge of local and national electrical codes and standards
  • Installation and labeling of circuit cables
  • Relevant licenses
  • Installation, maintenance, and repair of fire alarm systems
  • Maintenance of tools and equipment
  • Repair of electrical systems
  • Repair of cable systems, conduits, and related equipment
  • Repair, maintenance, and renewal of single and three-phase cable systems
  • Replacement of faulty cables
  • Knowledge of occupational health and safety regulations
  • Reading circuit diagrams
  • Installation and termination of main switches, panels, and distribution equipment
  • Equipment testing and repair
  • Troubleshooting motor faults
  • Electrical mobilization and commissioning
  • Installation of internal and external electrical and plumbing systems in buildings
  • Panel manufacturing, maintenance, repair, and group starting systems
  • All types of cabling and adjustments (power, weak current, data, fiber optic)
  • Cable jointing and termination (crimping, junction boxes, data and fiber termination)
  • Cabling of low, medium, and high voltage systems
  • Generator and transformer feedback, power distribution, and starting
  • Repair, maintenance, and servicing of all electrical machines and devices
  • Automatic control and automation systems
  • Installation, maintenance, and repair of HVAC, chiller, cooling, and heating systems
  • Fire alarm system project implementation, troubleshooting, maintenance, and repair
  • Installation, welding, jointing, and termination of galvanized, PPRC, HTP, and PVC pipes
  • Mechanical installation, assembly, and dismantling
  • Grounding, thermowelding, PIT termination, and project implementation
  • Field grounding and termination works
  • Mechanical installations (panels, switchgear, lighting poles, barrier gates, conveyors)
  • Cable terminations
  • Heating system cabling
  • Installation, maintenance, and repair of heating and cooling systems
  • Electrical and data mobilization for construction sites and offices
  • Modular panel assembly, cable tray covering, and cable laying
  • Grounding, ROT applications, and busbar installations
  • Cable tray installation
  • Installation of lighting poles (28 m, 10 m, 4 m), CCTV, and public address systems
  • Mechanical and electrical assembly of 110 kV switchgear
  • Cable assembly of 110 kV switchgear
  • Personal Skills:

  • Analytical skills
  • Detailed project plan analysis
  • Meticulousness
  • Risk assessment
  • Decision making
  • Attention to detail
  • System control
  • Process evaluation
  • Keeping up with developing technologies
  • Problem solving
  • Manual dexterity
  • Teamwork
  • Reliability
  • Following instructions
  • Team training and management
  • Process improvement suggestions
  • Time management
  • Administrative Skills:

  • Evaluating options and procuring tools, equipment, and machinery based on job requirements
  • Preparing written reports for senior management
  • Organizational skills
  • Project planning

Timeline

BCC GROUP Mıngacevır/Baku/AZAERBAYCAN/NEW 1280

Musa KIRC, Apdullah HAR, Hakan KESICI
12.2023 - 04.2025

ENKA / HIGH-TECH MULTIFUNCTION MEDICAL COMPLEX

Ibrahim KARAAGAC, Bülent Arslan YUREK
05.2019 - 12.2023

ENKA - CSS/Tengiz PROJECT

Emre METIN, Emrah INCE, Alper ASTAN, Robert HARRIS
11.2017 - 02.2019

ENKA-CSG-2/SALKA PROJECT

Ozgur ASLAN, Muammer KUCRET, Hakan OCAL
01.2016 - 10.2016

ENKA-CSG-1 GARDABANI PROJECT

Umit Feti BINGOL, Emre METIN, Gokhan PORTAKAL
11.2014 - 01.2016

ENKA-WEST QURNA GAS TREATMENT POW.GEN.-DIST.PRJCT.

Onur KILIT, Mehmet DURGUT, Ilvan ATLI, Ugur ZORLU
11.2012 - 10.2014

ENKA/MAJNOON PETROCHEMICAL PLANT

Osman DEMIR, Cetin SAHIN
01.2012 - 10.2012

No Degree - Faculty of Business Administration

Anadolu University
04.2001 -

OZ-EL ELEKTRIK

Own Business
03.1999 - 01.2012

GONEN SIRKETLER GRUBU

Birol YUVARLAK, Sevki TUFAN
03.1999 - 01.2012

51. PIYADE TUGAYI

Reference Letter
07.1993 - 06.1995

SURTAS MERMER FABRIKASI- Beylikduzu

Bahattin KELES, Cemal KELES, Ali KELES
05.1991 - 04.1993

ER-NA YAPI SANAYI- BUYUKCEKMECE/GURPINAR

Social Security Records Available Upon Request
11.1988 - 01.1991

) ELTA ELEKTRIK SANAYI VE TICARET AS.-

Social Security Records Available Upon Request
10.1986 - 09.1988

T.C.D.D.Y. - Turkish State Railways – Seyhan

School Records
02.1986 - 05.1986
MEHMET OZKARULElectrical Supervisor