Overview
Work History
Education
Skills
Certificatesandtrainings
Employmentstatus
Educationalstatus
Militarystatus
Personal Information
Languages
Timeline
Generic
Ilker Cetin

Ilker Cetin

Mechanical Engineer
Balıkesir,10

Overview

19
19
years of professional experience
6
6
years of post-secondary education

Work History

Plant Maintenance Manager

TRBOR BOR Teknolojileri A.S.
11.2022 - Current

As plant maintenance manager , I am responsible for keeping boron carbide production plant always ready for production and continous process.

Construction ,civil works, commissioning engineering phases of project was completed with EPC contractor Chineese company CMEC .

A special factory with production process and equipments for defence industry and boron carbide .

Maintenance of Electrical arc furnaces, sulphuric acid lines, carbon removal process equipments, sedimentation tanks, crushers ,transformers, dedusting equipments ,sanders ,pumps

Plant Maintenance Manager

Yıldız Bakır Madencilik A.S.
7 2019 - 11.2022
  • Maintenance of Gold and zinc mine process equiments

Maintenance Superintendent

TUMAD Mining Lapseki Gold Mine
10.2016 - 02.2019
  • Attended all construction,commisisioning and start-up operations of Metso minerals crushing and screening equipments (Apron feeder,VG540 Scalper screen,C120 Jaw crusher,GP300S Secondary crusher,HP5 Tertiary crusher,conveyor belt systems,ERSEL Ball mills ,Pre-leach thickener(OUTOTEC),Leach tanks and agitators,CIP Pumpcell,Detox unit and its equipments,ADR and chemical preperation plant,NaCN area,Fire water lines and tanks,all slurry and water pumps ,Atlas Copco compressors and blowers, ISHIGAKI Filter presses and dry waste stocking area pumps and also mobile equipments .(Hi-up,Telehandler,Mini loader,Lightning towers,generators etc
  • Also responsible for Laboratory equipments and their maintenance operations
  • Supplying raw and potable water for main production plant .(12 km HDPE pipeline with 10 l/s water supply )
  • I worked with project department in designing and installation activities for Warehouse , workshop ,ancilliary facilites Construction phases
  • Responsible for Preparation of annual budgets of maintenance department
  • Leading for preparing of planning maintenance activis for equipments and plants .Iam responsible for below detail mentioned maintenance team: (Blue collars; white collars staff) Electrical chief,1 electrical enginer, 1 electrical foreman;8 electrical and instrumentation technician,5 electrical operator of 154 Kv switchyard.Mechanical chief,1 mechanical engineer,1 foreman,25 mechanical maintenance technician,preventive maintenance chief-mechanical, 1 preventive maintenance technician,1 office boylubrication analysis lab texchnician
  • Preparing all procedures and forms related with work permits,Toolbox organisations,Job Safety Analysises and trainings
  • Organising regular meetings with production every morning and weekly maintenance meetings
  • Readiness for SAP maintenance module instead of MS-AXAPTA P-MAX Maintenance programme
  • Construction phase ,commissioning and start up activities of the plant
  • Keeping all equipments in safe and ready to use during construction before commissioning

Mechanical Team Leader

ADULARYA 2x145 MW FLUIDIZED BED POWER PLANT
09.2011 - 10.2016
  • ENERJI YUNUS EMRE 2X145 MWe CFBB THERMAL POWER PLANT, _MechanicaL Erection and Commissioning, Coal stackers,coal crushers,coal conveyors,ash tube conveyor ,ash humidifiers,limestone plants, LNG Plant and ash-limestone,fire Pipelines
  • Mechanical Erectioning and commissioning activities includes For both civil objects and process systems within the Project of 2x145 MW CFBB power plant under management of EPC (VPE-VITKOVICE POWER ENGINEERING from Check Republic ) Civil object projects include concrete works,locksmith products,tinsmith products ,Steel structure and construction,HVAC,electrical ,earthing ,lighting ,lightning,Fixed Extinguishing Systems(FES);Fire systems and plumbing equipments’ installation works
  • For process systems of coal and ash it includes erectioning,commissioning and start-up of the equipments of Ash storage yard and pumping station with pool, Coal storage yard,Coal Crushing building,coal and ash conveyors ,bridges,towers,Ash silos,Limestone silos,Powder limestone silo,Limestone stock silo,bunker
  • Participating of Quality control phases of civil and process systems .i.e
  • CFI (Call for inspections),ITP (Inspection Test Protocols),NCR(Non-comformity reports,MoM(Method of Statements)
  • Conceptual;basic and detail design works for Process systems of :
  • Auxiliary Plants : Coal storage yard plant with 2 stacker/reclaimer machines having capability of 900 t/h stacking and 600 t/h reclaiming of 0-50 mm coal fuel transported from mining department coal Washing plant and after handling with 2 stackers-reclaimers and conveying it through Yard belt conveyor systems to coal handling system
  • Coal handling system with 4 Gundlach crushers that crushes the coal under 10 mm and handles it with belt conveyors of 600 t/h conveying capacity .It also includes coal sampling unit and environmental protection systems with filters,rotary feeders and vacuum cleaning systems
  • Limestone preparation process with 2 vertical mills of 90 t/h milling capacity of limestone from 20-50 mm to 45 -700 microns,pneumatic transportation of micronised limestone to Daily silos in boiler plant with pipelines via service air supplied from a compressor station of limestone preparation process
  • 600 t/h ash (fly ash,bed ash) handling system with 3 silos ,ash humidifiers(mixers) ,mixing water system , and belt conveyor systems including tube belt, -ash storage yard with a capacity of 3.550.000 m3 with ash humidifying pumping station, -limestone handling 60 t/h to boiler plant -limestone and ash silos process Design and Management-
  • Central Compressor Station process equipments erectioning,commissioning and start-up operations
  • Fixed fire extinguishing systems erectioning,commissioning and start-up operations
  • Also commissioning of electrical, I&C equipments within the programmed daily log schedules of mentioned plants
  • Erectioning Works participated mentioned below
  • Fluidized Bed Boiler Area:
  • STEEL STRUCTURE WORKS :Stair towers,Main columns,platforms and stairs,,gratings and chequered floor plates,Handrailings and ladders,brackets for cladding Works,PAINTING WORKS FOR STEEL STRUCTURES
  • On-site Production and erection Works of Furnace hopper ,loop seal ,hot cyclone;furnace wind box;connecting ducts (HP air to Bed Lance,HP Air to Windbox and Syphon,Primary air bed lance;Primary air preheater 3,Primary air suction pipe to fan,Primary air to fuel chutes; Sealing air to syphon, Secondary air distribution,Secondary air level1&2; Secondary air start burner distribution;Secondary air suction pipe to fan,Secondary air to air preheater,Secondary air to exp
  • Joint and fuel chute)
  • Combustion air sytem primary and secondary fan erection and installation Works
  • Flue gas system recirculaion fan (Vapour exhaust duct,Economizer and air preheater duct,Ash hopper and connecting duct to flue gas cleaning,Recirculated flue gas duct,FLUE GAS DUCT 2nd PASS,ASH HOPPER WITH FLUE GAS DUCT,Recirculation gas – Suction, Recirculation gas to primary air
  • BOILER PRESSURE SYSTEM Front and rear wall to drum – supports,Boiler drum,Furnace membrane walls,Superheater pass left side/right side);Superheater pass front/rear wall and ceiling,Economizer and economizer system piping
  • Connecting pipings, Drain-vent piping,Auxiliary steam to air preheater
  • Chemical dosing system,sampling system;sootblowers(62 pcs),Boiler coal feding systems and bunkers
  • OIL IGNITION AND FIRING system ,LIFTING SYSTEMS HOISTS,CRANES,CHAIN HOISTS;LIMESTONE FEEDING SYSTEM,SAND FEEDING SYSTEM,BED ASH HANDLING AND CONVEYING SYSTEM,FLY ASH HANDLING AND
  • CONVEYING SYSTEM,SNCR System,REFRACTORY WORKS;SAFETY VALVES -STEAM TRAP_ VALVES;Miscellanous piping (Auxiliary steam,Air system,Cooling water,Fire fighting)_DRAINAGE VALVES;INTERNAL CONNECTING PIPES
  • START-UP STABILIZING FUEL SYSTEM (Fuel Oil Storage Tanks, Fuel oil Unloading and heating)
  • AUXILIARY BOILER AND HEAT EXCHANGER SYSTEM
  • ERECION WORKS of equipments and pipelines for ESP (Electrostatic Precipitator);Blowers,Turbocharger unit;FLUE GAS SYSTEM,INDUCED DRAUGHT FAN SYSTEM,TURBOREACTOR AND PRODUCT RECIRCULATION SYSTEM,RESIDUE
  • HANDLING SYSTEM,SORBENT HANDLING SYSTEM,PROCESS WATER SYSTEM,TECHNOLOGICAL STEEL STRUCTURES,PAINTING,INSULATIONS
  • Erection Works of equipments and pipelines for Machine Hall -Turbogenerator Unit were TURBOGENERATOR 2X145 MW& FEED WATER SYSTEM,AUXILIARY COOLING SYSTEM,COOLING WATER PUMPING STATION,COMPRESSOR STATION,FIRE FIGHTING WATER PUMPING STATION,COOLING TOWER,POLISHING PLANT SYSTEM,FIXED EXTINGUISHING SYSTEM CHEMICAL TREATMENT PLANT,PUMPING STATIONS,RAW WATER BYPASS SYSTEM,WORKSHOP AND WAREHOUSE,Diesel Generator Set
  • Logistics operations and Handling over all equipments and spare parts from EPC i.e
  • VPE and its main subcontractors ANDRITZ,CKD,WABAG,EFOR,TSO and other subcontractors.Data executing and recording data works of all spare parts (mechanical,electrical,I&C,hvac,çivil construction materials)

Maintenance Planning Specialist

ANATOLIA MINERALS COPLER GOLD MINE
02.2010 - 9 2011

S. SCHEDULAR & PLANNER MECHANICAL ENGINEER.
COMMISSIONING,ERECTIONING AND START-UP WORKS OF MECHANICAL SYSTEMS.
PREPARING MACHINE MAINTENANCE CARDS, MAINTENANCE SCHEDULES, ORDERING STOCK ITEMS, ORDERING NON-STOCK ITEMS, , MAINTENANCE PLANNING, WORK ORDER PREAPARING,OUT SOURCE PLANNING,LABOUR PLANNING, TRAINING PLANNING,

Maintenance Chief

ETİ GÜMÜŞ A.Ş
05.2007 - 2 2010
  • Crushing-Screening Department & Construction Machines-Truck Workshop Maintenance Chief Job description: Planning the investments and choosing the equipments
  • Making technical contracts and technical deals
  • Coordinating and installing of new crushing and screening investment unit of 500 tons/h.This unit consists of a C-145 Jaw crusher, a Grizzly screen,2 pcs of Nordberg HP 500 Crushers ,1 pc of Nordberg HP 4 Crusher,1 piece of Riple Flo Screen,1 Hein Lehmann Screen and 22 pcs of conveyor system with 1.022 metres length of rubber belt
  • Checking the subcontractors and their contracts
  • Organising the cranes and construction machines for maintenance unit and subcontractors.:(10 ton-30 ton-40 ton-85 ton-160 ton- 300 ton ) app 20 pcs
  • Checking bills of crane hiring companies
  • Checking usage of steel construction materials
  • That plant has started to feed ball mills app
  • 500 tons/h
  • I have worked actively in all investment programmes of increasing the capacity of production departments such
  • The investment consists of : increasing the ball mills from 2 to 4 in grinding department; installing and operating of 32 pcs of SMD ( 32X355 Kw )and 2 pcs of VTM 1500 Kw mills with their all slurry pumps,cyclones,pipelines,vanes ans steel construction producing and installing operations in ultrafine grinding department ,( METSO MINERALS ) -Additional of new 5 thickeners of 36 m diameter (3000 m3) -Installation of new merrill crowe (2400 m3/h ) solution unit consisting of 9 precipitate filters and 9 clarifier filters,zinc dust feeding system,vacuum pumps etc
  • At the same time organising the routine maintenance operations of the factory with 65 employees in maintenance workshop
  • Maintenance operations consist of: Keeping on of working of 20 years old crushing and screning unit ( 26 conveyor belts-1500 m length, METSO FS 353 Screen, Krupp secondary crusher, Nordberg HP 300 tertiary crushers, Krupp jaw crusher and 2 Rammer hydroulic rock breakers
  • Executing the maintenance operations of Nordberg Lokotrak ST 356
  • Mobile screen , Executing the maintenance operations of 2 small constant screening department Organising the construction machine and truck workshop with 22 workers
  • The construction machines are all products of CAT ( 330C-345-365-385 Excavators, D8L Bulldozer,140 M-140 G Graders,forklifts, HITACHI ZX 870 ,MAN TGA-33 360 dumper trucks, MERCEDES AXOR 3340 dumper Trucks etc
  • Planning and executing of maintenance operations of these machines and trucks
  • Executing the maintenance programs of all merrill crowe process ( leach section, thickeners,SMD & VTM Ultra Fine Grinding department i.e
  • 32 stirred media detritors and 2 Vertimills Preparing the natural gas investment file.LNG & Pipeline project..600 Nm3/h consumption was assumed
  • Preparing the investment comparing file of emptying the tailings ( app
  • 20.000.000 m3) with dredge system and pumping the solid material to VTM department.

RENAULT MAIS REGIONAL DEALER, SPARE PARTS MANAGER

GUVEN CAR COMPANY
06.2005 - 11.2007
  • AUTHORIZED RENAULT AND DACIA SERVICES OF ESKİŞEHİR-K
  • TAHYA-AFYON CITIES
  • COORDINATING ALL SPARE PARTS AND SERVICE STATION MANAGEMENT
  • MAKING DEALS WITH INSURANCE COMPANIES FOR DAMAGED CARS
  • MAKING DEALS WITH FLEET CUSTOMERS.

Service and Spare Parts Manager

FORD - OTOKOÇ OTOMOTİV TİC.SAN.A.Ş
7 2001 - 3 2004

SERVICE AND SPARE PARTS MANAGER OF AUTHORIZED FORD CAR AND COMMERCIAL VEHICLES SERVICES OF ESKİSEHIR-KUTAHYA-AFYON CITIES. COORDINATING ALL SPARE PARTS AND SERVICE STATION MANAGEMENT. MAKING DEALS WITH INSURANCE COMPANIES FOR DAMAGED CARS. MAKING DEALS WITH FLEET CUSTOMERS.

Foundry Mechanical Maintenance Engineer

TOPRAK DEMIRDOKUM A.S.
04.1999 - 9 2001
  • Foundary mechanical maintenance engineer
  • Casting factory, Organising the maintenance operations of the casting factory i.e
  • Main casting lines, conveyors, main moulding machines, and production units coordinating 65 employees
  • Modelling and manufacturing with I-DEAS programme
  • Making interviews with customers ( ,CAT ,PERKINS,ARVINMERITOR,KNORR -BREMSE,BOSCHREXROTH ) , Making corrections on technical drawings.
  • As logistics engineer,In logistics department, supplying raw materials and equpments for the factory
  • Represanting the compnay in on-line e- bids
  • Reprting directly to general manager.
  • CAD/CAM Engineer, CAD / CAM engineer
  • Modelling and manufacturing with I-DEAS programme. Making interviews with customers ( ,CAT ,PERKINS,ARVINMERITOR,KNORR -BREMSE,BOSCHREXROTH ) , Making corrections on technical drawings

Education

Master's Degree - Mechanical Engineering

Eskisehir Osmangazi University
01.2008 - 07.2010

Bachelor's Degree - Mechanical Engineering

Eskisehir Osmangazi University
09.1993 - 07.1997

Skills

BOYS Maintenance Management Programme,LOGO Tiger Plus,SBOM,AXAPTA,MS OFFICE EXCEL,WORD,POWERPOINT,ACCESS , MS OUTLOOK ) ,MS XP PROFESSIONAL,MS VISTA,LINUX, SAP ;CANIAS Maintenance modüle lotus notes, I-DEAS Master series, Internet ,international commerce programmes,e-bid programmes

Certificatesandtrainings

  • APPLYING RISC BASED THINKING IN ISO 9001:2015, www.iienstitu.com (By Dilek AKSOY), 10, 01/02/2021-03/02/2021
  • Data Science Applications in Digital Twin and Manufacturing, TMMOB Chamber of Mechanical Engineers, 6, 30/01/2021-31/01/2021
  • Strategical Management Certificate, 310110030081, www.iienstitu.com (By Bilal ŞENTURK), 10, 26/01/2021-31/01/2021
  • Business Ethics_İş yerinde görgü ve etik kuralları, www.iienstitu.com (By Zuhal YILMAZ), 6, 30/01/2021-31/01/2021
  • Business English Skills : How to write effective openings and closings to emails?, University of Washington _www.cousera.org, 4, 30/01/2021-31/01/2021
  • WEBINARS - 200 various trainings, Chamber of Mechanical Engineers of Turkey, 300, 05/2020-12/2020
  • SAP_MAINTENANCE MODULE ASSET MANAGEMENT, ÇÖZ
  • M A.Ş., 300, 03/2018-02/2019
  • LNG Plant Controls, İPRAGAZ, 8, 2018
  • HSE Trainings, TUMAD, 120, 2018-2019
  • SAFETY AT ELECTRICAL WORKS_ELEKTRİK İŞLERİNDE G
  • VENLİK EĞİTİMİ, DETAM, 8, 20/06/2013
  • USING AND CHOOSING OF PERSONAL PROTECTIVE EQUIPMENTS_KİŞİSEL KORUCU MALZEME SEÇİMİ VE KULLANIMI, DETAM, 8, 13/06/2013
  • WORKING AT HEIGHT _Y
  • KSEKTE ÇALIŞMA EĞİTİMİ, DETAM, 8, 6/06/2013
  • SAFETY AND HEALTH SIGNS_G
  • VENLİK VE SAĞLIK İŞARETLERİ, DETAM, 8, 5/06/2013
  • GENERAL HEALTH AND SAFETY_WORK ACCIDENTS AND OCCUPATIONAL DISEASES _GENEL İŞ SAĞLIĞI VE G
  • VENLİĞİ_İŞ KAZALARI VE MESLEK HASTALIKLARI, DETAM, 8, 19/09/2012
  • LEGISLATION_WORKERS’ RIGHTS AND RESPONSIBILITIES_YASAL MEVZUAT_ÇALIŞANLARIN HAK VE SORUMLULUKLARI, DETAM, 8, 9/09/2012
  • BASIC FIRE TARINING AND FIRE DRILL_TEMEL YANGIN EĞİTİMİ_YANGIN SÖND
  • RME TATBİKATI, DETAM, 8, 31/08/2012
  • BASIC INFORMATION ON HEALTH AND SAFETY _İŞ SAĞLIĞI VE G
  • VENLİĞİ TEMEL BİLGİLENDİRME, DETAM, 8, 30/06/2012
  • TIME MANAGEMENT, ANAGOLD MINING, 8, 21/04/2011
  • ADVANCED MS EXCEL, BILISIM TRAINING CENTER-ANAGOLD MINING, 40, 14/02/2011-18/02/2011
  • PROCESS AND MAINTENANCE TRAINING OF GOLD MINE, PERFORMANCE ASSOCIATES-ANAGOLD MINING, 120, 15/11/2010-30/11/2010
  • GOLD MINE ADR PLANT CIC PLANT CRUSHERS START UP PROCESS AND MAINTENANCE TRAINING, PERFORMANCE ASSOCIATES-ANAGOLD MINING, 120, 01/12/2010-16/12/2010
  • LOCK OUT / TAG OUT : THE 9 BASIC RULES, ANAGOLD MINING, 8, 23/11/2010
  • PERSONAL FALL PROTECTION, ANAGOLD MINING, 8, 18/11/2010
  • FORKLIFT MANEUVERS -SAFE FROM THE START-WORK SAFELY IN DANGEROUS SITUATIONS, ANAGOLD MINING, 8, 16/11/2010
  • LOCK OUT / TAGOUT - LIGHTNING IN A BOTTLE, ANAGOLD MINING, 8, 26/10/2010
  • POWERED HAND TOOL SAFETY, ANAGOLD MINING, 8, 21/10/2010
  • STAIRWAYS AND LADDERS, ANAGOLD MINING, 4, 19/10/2010
  • CONFINED SPACE ENTRY_KAPALI ALAN ÇALIŞMA, ANAGOLD MINING, 8, 14/10/2010
  • WORKING SAFELY IN CONFINED SPACE, ANAGOLD MINING, 8, 12/10/2010
  • PERSONAL PROTECTIVE EQUIPMENT_KİŞİSEL KORUYUCU EKİPMANLAR, ANAGOLD MINING, 4, 7/10/2010
  • LNG Plant Controls, KOÇ STATOIL /AYGAZ, 8, 5/10/2009
  • Foreign Trade Certification, ERA TRAINING, 60, 24/11/2006-24/01/2007
  • CUSTOMER SATISFACTION MANAGEMENT, IDEA TRAINING_Cetin CİNEMRE, 60, 25/02/2004-3/03/2004
  • QUALITY IN SERVICE OPERATIONS, IDEA TRAINING_Cetin CİNEMRE, 16, 16/12/2003
  • SERVICE AND SPARE PARTS MANAGER ,FINACE,MANAGEMENT AND CONTROL TRAINING, FORD OTOMOTİV SAN.A.Ş., 40, 17-20/11/2003
  • LEADERSHIP, TMI & PDR INTERNATIONAL, 8, 9/11/2003
  • AUTOMOBILES,LIGHT AND HEAVY VEHICLES _TYRES TECHNICAL TRAINING, LASSA-BRISA, 8, 12/08/2003
  • AUTOMOBILES,LIGHT AND HEAVY VEHICLES _TYRES TECHNICAL TRAINING, TURK PIRELLI A.S., 8, 5/06/2003
  • SERVICE MANAGER TRAINING LEVEL III, FORD OTOMOTİV SAN.A.Ş., 60, 06-09/05/2003
  • ISO 16949 GENERAL TRAINING, BUREAU VERITAS, 16, 20/02/2003-22/02/2003
  • 2ND BEST FORD SERVICE IN TURKEY_FORD

Employmentstatus

Working

Educationalstatus

Master's Degree (Graduate-w/o thesis)

Militarystatus

Completed (15.03.1999)

Personal Information

  • Total Experience: 18 Years
  • Place of Birth: Turkey - Eskişehir
  • Number of Children: 7 years old, boy
  • Date of Birth: 12/16/73
  • Nationality: T.C. Republic of Turkey
  • Driving License: B (1992)
  • Marital Status: Married

Languages

English
Italian
Russian

Timeline

Plant Maintenance Manager

TRBOR BOR Teknolojileri A.S.
11.2022 - Current

Maintenance Superintendent

TUMAD Mining Lapseki Gold Mine
10.2016 - 02.2019

Mechanical Team Leader

ADULARYA 2x145 MW FLUIDIZED BED POWER PLANT
09.2011 - 10.2016

Maintenance Planning Specialist

ANATOLIA MINERALS COPLER GOLD MINE
02.2010 - 9 2011

Master's Degree - Mechanical Engineering

Eskisehir Osmangazi University
01.2008 - 07.2010

Maintenance Chief

ETİ GÜMÜŞ A.Ş
05.2007 - 2 2010

RENAULT MAIS REGIONAL DEALER, SPARE PARTS MANAGER

GUVEN CAR COMPANY
06.2005 - 11.2007

Foundry Mechanical Maintenance Engineer

TOPRAK DEMIRDOKUM A.S.
04.1999 - 9 2001

Bachelor's Degree - Mechanical Engineering

Eskisehir Osmangazi University
09.1993 - 07.1997

Plant Maintenance Manager

Yıldız Bakır Madencilik A.S.
7 2019 - 11.2022

Service and Spare Parts Manager

FORD - OTOKOÇ OTOMOTİV TİC.SAN.A.Ş
7 2001 - 3 2004
Ilker CetinMechanical Engineer