Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Timeline
Generic

İlay Karşıcı Kulu

Bursa

Summary

Results-oriented Mechanical Engineer with over 3 years of experience specializing in project method engineering and production line adaptation. Proven expertise in managing complex projects from conception to completion, including designing and implementing new processes and equipment. Adept at coordinating with cross-functional teams, conducting design reviews, and managing resources and budgets effectively. Skilled in utilizing advanced technologies such as C++ programming, and vision systems (Keyence, Sensopart), Weber screw drivers, magnetizing process, Promess Pres. Demonstrated success in optimizing production lines and achieving significant cost savings, with a track record of delivering projects on time and within budget. Passionate about driving continuous improvement and innovation in manufacturing processes.

Overview

4
4
years of professional experience

Work History

P0 P1 Process Manufacturing Engineering PTM

Valeo Climate Control
03.2021 - Current

KKL BLDC (2021-2022), MRA2 GEN2 (2022-2023), MEB GEN2 (2022-2023), Line Adaptation

  • Objective: To make the KKL BLDC suitable for production by modifying the existing line.
  • Conducted design reviews with R&D.
  • Managed resources and budgets.
  • Created and modified FMEA, Work Instructions, and SOPs.
  • Defined, planned, and coordinated the implementation of new processes and equipment.
  • Completed line feasibility studies.
  • Collaborated with suppliers for line modifications.
  • Managed production of PV parts and prepared industrial planning.
  • Conducted capacity analysis for new projects.
  • Prepared first-level maintenance instructions and completed blower line, balancing machines, and blower EOLT acceptance (including calculation of Cp-Cpk, MSA masters).
  • Prepared FDPR reports and created ECRs.
  • Implemented cycle time improvements for each station in the production line.
  • Streamlined workflow processes, resulting in decreased lead times and increased customer satisfaction.
  • Created product references in SAP.
  • Achievements: Project closure on time and achieved a 60% profit in line adaptation by working with local suppliers.
  • Fostered a culture of continuous improvement within the organization through employee engagement initiatives such as Kaizen events or Six Sigma projects.

NCAR BLDC L4 New Line (2023-Ongoing)

  • Objective: Establishment of a new production line (MOTOR+BLOWER+ROTOR+STATOR+Blower Balance+Blower EOLT lines).
  • Participated in design reviews with suppliers.
  • Prepared industrial planning and created product references in SAP.
  • Conducted POC (Proof of Concept) and mockup studies.
  • Performed MOST (Maynard Operation Sequence Technique) cycle time studies.
  • Created a supplier choice matrix and managed line acceptance at suppliers’ plants (India and France).
  • Achieved acceptance for rotor, motor, blower lines, and balance machines for SAD and MEB GEN2, as well as blower EOLT machines for SAD and BASELINE3.
  • Assisted in facility layout planning with a focus on maximizing space utilization and workflow optimization.
  • Prepared FDPR reports and created/modifying FMEA, Work Instructions, SOPs, and SOCO (Start of Continuous Operation).
  • Ensured safety compliance by enforcing company policies, conducting audits, and providing necessary training to staff members.
  • Successfully managed multiple projects simultaneously while adhering to strict deadlines and budget constraints.
  • Developed technical specifications for supplier sharing.

VOLVO BLDC Current Line Modification (2024-Ongoing)

  • Objective: Modify the existing line to enable production of VOLVO BLDC.
  • Conducting DFA (Design for Assembly) analysis.
  • Participated in POC studies and design reviews with R&D.
  • Managed resources and budgets.
  • Created and modified FMEA, Work Instructions, and SOPs.
  • Defined, planned, and coordinated the implementation of new processes and equipment

Education

Faculty of Engineering - Mechanical Engineering

Bursa Uludağ University
Bursa, Turkey
04.2001 -

Skills

    Project management

    Process risk assessment

    Process commissioning

    Process flow analysis

    Team Collaboration

    Process Development

    Multitasking

    Problem-solving abilities

    Process Documentation

Accomplishments

  • Project closure on time
  • 60 percent profit was achieved for line adaptation by working with local suppliers

Languages

Turkish
Native language
English
Advanced
C1

Timeline

P0 P1 Process Manufacturing Engineering PTM

Valeo Climate Control
03.2021 - Current

Faculty of Engineering - Mechanical Engineering

Bursa Uludağ University
04.2001 -
İlay Karşıcı Kulu