Simatic Manager

Electric Automation Engineer with strong background in erection, commissioning ,systems integration. Skilled in PLC programming, HMI design ,system integration and problem-solving. Collaborating effectively with teams and adapting to evolving project requirements.
Investment electrical works of new ETL and SPM lines;
Planing and coordination of electrical site jobs
-Site electric power distribution
-Grounding for electrical and mechanical equipments
-Environmental lighting
-Roof Lighting of site
-Erection Jobs
Preparation of machine technical specification of electrical equipment
Budget planning according to the project scope
-Scope of my responsibilities included all coating lines (ETL,CGL,CCL,ETL-IL) and steel service lines (ETL-SH, SL and SH)
Before the production started, worked on project erection and commissioning of these lines.
-Project control and coordination of subcontractors and line technical suppliers
-Erection and commissioning electrical jobs tracking, reporting;
-Scope of project; transformer, PCC, cable, cable trays, automation panels and instrument erection and commissions jobs.
-I/O checks and machine function checks.
-Hot Commissioning complete line functional check, maintenance, trouble-shooting.
-Complete line package units (TMEIC welder , IMS coating gauges, EMG strip guiding systems , IPS, Inducto-Therm...)
-Production phase planning maintenance , troubleshooting for electrical and automation problems
-Managed documentation efforts related to the design, installation, and operation of automated systems, ensuring accurate records were maintained for future reference.(Using IBA Tracking Software)
-Participated in root cause analysis efforts to resolve complex issues related to automated equipment performance.
-Preparation of maintenance plans of line equipments
-Preparation of spare part lists and critical equipment lists
-Planning and coordination of electrical jobs and technicians for maintenance
-Managed all electrical and automation jobs in Melt shop (EAF, LF, RMH,FTP and CCM)
-Organisation of maintenance and repair jobs, Trouble-shooting of electrical and automation problems.Participated in root cause analysis efforts to resolve complex issues related to automated equipment performance.
-Managed documentation efforts related to the design, installation, and operation of automated systems, ensuring accurate records were maintained for future reference.
-Planned and organised maintenance of the EAF , LF power transformer and online tap changers.
-Used Siemens PLCs, ABB and Siemens LV Drives , WINCC and Wonderware Intouch for the scada systems
-Worked as an Electrical & Automation Engineer for Meltshop and Thin Slab Caster.
- Worked with line supplier company and subcontractor for Erection and commissioning jobs in meltshop (EAF, LF, RMH, FTP , Carbon and Oxygen Systems and TSC)
-Worked with Siemens S7 300,S7 400 PLCs, Wonderware Intouch and Siemens WINCC Scada
-Maintenance and control of the Instrumentations, Transformers , ABB and Siemens Drives were in our responsibilities.
-Managed the organisation of maintenance and repair, Trouble-shooting of electrical and automation problems, working to prevent the problem not to repeat in the future
-Made revisions to the HMI and PLC software to improve line performance and minimize line production stoppages.
Simatic Manager
TIA Portal
WINCC
Sinamics
Wincc Flexible
Wonderware InTouch
Phyton
Melseq PLC
Twincat
Unico Inc. Drives And Systems
Industrial automation
Unico Inc. Drives And Systems
Surface/Paper Master Training ISRA Vision Academy
Theoretical and Practical Training on Vertical Hot Dip Galvanizing Line Automation and Electrical Maintenance
Hitachi; Drive Systems, Level 1 Automation, HMI, HISEC-04/R900, MICA
SMS Siemag Electric and Automation System of Electrical Tinning Line