

Accomplished professional with expertise in Quality Management Systems and a proven track record in problem-solving and CAPA investigations. Demonstrates proficiency in control plan development, SPC - Gage R&R studies, and MSA plan creation and application. Skilled in P-FMEA, PPAP-APQP, and process KCs determination, with a strong ability to interpret customer specifications and drawings (GD&T). Adept at inspection tool calibration interpretation, verification, and special inspection tool designing. Experienced in applying and performing outside vendor audit plans. Committed to driving continuous improvement and ensuring compliance with aerospace standards.
-Assisted in creating APQP packages with all stakeholders for each NPI part, including control plans, process flow diagrams and P-FMEAs.
-Compiled FAI/FAIR documents in alignment with customer specifications.
-Supported process and product change cycles with relevant stakeholders upon drawing changes.
-Implemented and tracked SPS cycles for significant process changings such as coating or ECM process.
- Designed and prepared concepts for special inspection tools used in inspection and production operations.
- Communicated with stakeholders to identify root causes and corrective actions for nonconformances through shop floor tours and process investigations.
- Prepared and developed inspection operation sheets for parts under own responsibility.
- Conducted and monitored SPC studies using Minitab to maintain updated and effective control plans in line with customer requirements.
- Assisted in conducting improvement studies for quality processes using SPC and Gage R&R tools.
- Supported preparation and regular updates of quality control plans to facilitate run-reduction in quality processes.
- Implemented new test methodologies and monitored their application in the workshop.
- Raised awareness of global quality KPIs among operators and stakeholders.
- Reported monthly to European HQ regarding quality scorecard parameters including customer complaints and RCCA return dates.
- Collaborated with production teams to address complaints and followed up on the effectiveness of corrective actions.
- Conducted regular technical visits for Class A customers to ensure the efficiency of corrective actions.
- Achieved high standards in incoming inspection, in-process reviews, and final product assessments.
- Delivered compliance with AS9100 aviation standards through rigorous product follow-up.
- Enhanced customer relations by leading technical review visits, both domestically and abroad.
- Streamlined documentation processes for all qualification requirements in aviation and power sectors.
- Realised efficient coordination of PPAP and APQP studies for Rolls Royce aviation as PPAP coordinator.
- Drove quality and production improvements through targeted investigation studies.
- Successfully prepared AS9102 FAI forms for aviation customers, including GE Aviation and Rolls Royce.
- DSQR (Delegated Supplier Quality Representative) - May 2025
- PR (Preliminary Review) - March 2023
- Problem Solving and RCCA Analysis - July 2023