
Date of Birth: 11 July 1973
Nationality: Iranian
Medical Gas Systems Designer & Installer | Hospital Projects East & West Azerbaijan Provinces, Iran
-Designed and installed medical gas piping systems and equipment for hospitals and operating rooms
-Specialized in oxygen, vacuum, compressed air, and anesthesia systems
-Projects covered more than 10 hospitals and numerous specialty clinics
| Gas Supply Projects & Technical Operations East Azerbaijan Province, Iran | Jul 2000 – Aug 2004 Managed technical operations and supervised workshops across various gas distribution projects.
Established and led a company specializing in gas infrastructure development.
Strategic leadership, oversight of operations, and corporate governance.
Supervised large-scale engineering projects in the natural gas sector.
GPA: 13.46 out of 20
Medical Gas Systems Designer & Installer | Hospital Projects East & West Azerbaijan Provinces, Iran• Designed and installed medical gas piping systems and equipment for hospitals and operating rooms • Specialized in oxygen, vacuum, compressed air, and anesthesia systems • Projects covered more than 10 hospitals and numerous specialty clinics | Mar 1997 – Mar 2021
Executive Manager | Gas Supply Projects & Technical Operations East Azerbaijan Province, Iran | Jul 2000 – Aug 2004
Managed technical operations and supervised workshops across various gas distribution projects.
Founder and CEO | RADCHAL SAHAND Company Tabriz, Iran | Sep 2004 – May 2016
Established and led a company specializing in gas infrastructure development.
Chairman of the Board | RADCHAL SAHAND Company Tabriz, Iran | Jun 2016 – Present
Strategic leadership, oversight of operations, and corporate governance.
Founder and CEO | MAHAB SAHAND Tabriz Engineering Company Tabriz, Iran | Oct 2000 – Present
Supervised large-scale engineering projects in the natural gas sector.
-Skilled in the design, installation, and brazing of copper pipelines used in hospital medical gas systems and equipment.
-Executive Manager responsible for gas supply and civil construction projects, quantity take-offs, and all aspects of on-site operations and supervision.
-Preparation of income & expense reports for tax audits.
-Proficient in MS Project, PowerPoint, Word, Excel, AutoCAD, SketchUp, Photoshop.
-Class B driving license
➤ Medical Gas Projects (Chronological)
Bostanabad General Hospital – 96 Beds (1997)
Shabestar General Hospital – 96 Beds (1998)
Hadishahr General Hospital – 64 Beds (1998)
Hashtroud General Hospital – 96 Beds (1999)
Imam Reza Hospital, Tabriz – 400 Beds (1999)
Full design & installation of medical gas systems in:
Shams Hospital (Tabriz)-Army Hospital (Tabriz)-Behboud Hospital (Tabriz)- Nour Nejat Hospital (Tabriz)-Shahriyar Hospital (Tabriz)-Sina Hospital (Tabriz)-Other hospitals in East & West Azerbaijan(1999–2021)
➤HERE ARE SOME OF THE PROJECTS EXECUTED BY ME AND MY COMPANY IN IRAN:
Construction and installation of1000gas connections in Naghdeh County 2005/02 2006/03 .
Establishment of gas distribution and supply network in Karavansara village, Naghdeh 2005/03 2006/03 .
Gas supply to the villages of Asad Abad and Qiasiyeh . 2006/11 2008/10 .
Construction and installation of 2,800 gas connections in Bonab County 2007/09 2008/10
Establishment of gas distribution network for Mehr housing project in Sahand 2012/10 2013/01
Establishment of gas distribution network for11 villages in Ajabshir 2011/03 2013/02
Gas supply to the industrial axis of Bilverdi and its three affiliated villages in Heris County 2011/10 2013/11.
Construction of gas distribution network (steel and polyethylene) and supply network for Mehr housing project in Sahand 2012/10 2013/01
Implementation of gas supply line and entrance/exit for the TBS station in Gomand village 2014/03 2014/11
Implementation of entrance and exit for TBS stations in Bilvordi and Bilverdi Industrial Town 2014/03 2014/05
Execution of deficiencies in the gas supply line in Abesh Ahmad City 2014/10 2015/07
Establishment of gas distribution and supply network, and construction and installation of connections in Kalibar and Khoda Afarin cities 2015/03 2016/05
Execution of deficiencies in the gas supply line in Khoda Afarin County 2015/03 2016/11
Completion of operational deficiencies in the gas supply line in Abesh Ahmad City 2015/03 2015/05
Construction and installation of gas connections in Ahar County 2016/07-2018/02
Construction and installation of gas connections in Hoorand County 2016/07-2018/03
Repair and replacement of the30inch gas transmission line cover from Chalvand to Tabriz 2016/07 2017/10
Establishment of gas distribution and supply network, and construction and installation of gas metering vacant areas of Heris County 2019/04-2020/05
Implementation of entrance, exit, foundation, shading, landscaping, and lighting system for the CGS station in Pak Industrial Town 2019/12 2020/08