Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Personal Information
Software
Timeline
Generic
Gökhan Solak

Gökhan Solak

Senior Drilling & Completions Supervisor
Ankara,06

Summary

18 years’ experience including 6 years in offshore wells as a Drilling & Completion Supervisor. I have a bachelor’s of science in Petroleum and Natural Gas Engineering department from Middle East Technical University. After I graduated, my career started at a private company. I was then employed at Turkish Petroleum Corporation, which is the national oil company of Turkey and I worked there between 2008-2016 as a Drilling & Completion Supervisor including 4 years of experience at offshore rigs. I have been at Deep Drilling Wells, HPHT wells using MPD, horizontal wells using oil base mud. I have been in Northern Iraq and Afghanistan. My career then continued with various private companies until 2019 in Turkey and Iraq as a Drilling & Completion Supervisor. I worked at 2 HPHT deep wells in the Chia Surkh region of Iraq. I worked between 2019-2020 for Turkish Petroleum Corporation again as a Senior Drilling & Completion Supervisor. Then I am worked for SOCAR-AQS as a Senior Drilling Supervisor. Currently I am working for Park Place Energy as a Senior Drilling & Well Completion Supervisor and Team Leader on Offshore ERD Wells.

Overview

18
18
years of professional experience
2008
2008
years of post-secondary education
3
3
Certifications
1
1
Language

Work History

Senior Drilling & Completion Supervisor

Park Place Energy / Trillion Energy
04.2022 - Current
  • Company Overview: Planning and Execution of Offshore Ultra-Shallow ERD Wells in the Black Sea using Jack-up on fixed platform
  • Work on Ultra-Shallow Extended Reach Well design
  • Batch Drilling with Jack-Up Rig on Fixed Platform
  • Coil Tubing Barefoot Drilling
  • (MPD) Managed Pressure Drilling
  • MPD system was used in 17-1/2" section at early kick detection mode in 12-1/4" section at Constant Bottom Hole Pressure Mode to eliminate ECD effect with 19.5ppg mud
  • (PMCD) Pressurized Mud Cap Drilling, PMCD Method was used in 8-1/2" section to drill Jeribe, Dhiban and Euphrates Formation to reach to 7" casing point
  • Production water was used as sacrificial fluid
  • Floatation System usage on 9-5/8" Casing, 7" Liner and 4-1/2" Completion Tools (Davis Lynch Floatation Collar and Clean-Bore Glass Disc)
  • High T&D (HydraGlyde Mud - Mechanical Lubricity with Graphite)
  • Anti-Collision (Gyro While Drilling Tool and Jetting BHA)
  • Hole Cleaning (Split Flow Tools; PBL and JetStream)
  • Hole Enlargement 12-1/4" x 13" and 8-1/2" x 9" to mitigate shale swelling
  • RSS (Rotary Steerable Point to Bit System; Xcel in 17-1/2", 12-1/4 x 13" and 8-1/2" x 9" Section)
  • Low Density Cement (CemFit)
  • Simultaneous operations, producing while drilling
  • Shallow TVD (3000ft) and long MD (13000ft) ERD Wells
  • ERD Well design using K&M ERA software (ERD consulting company)
  • Monobore and Standard Completion using Schlumberger Completion Tools
  • Work on Well Intervention Operations with Snubbing Unit and run 2-3/8" Velocity String in ERD wells
  • Planning and Execution of Offshore Ultra-Shallow ERD Wells in the Black Sea using Jack-up on fixed platform

Senior Drilling Supervisor / Co-man

SOCAR AQS
05.2020 - 04.2022
  • Managing all drilling and completion activities
  • Working as Senior Drilling Supervisor at onshore Underground Gas Storage Project
  • Vertical Well Drilling (0-1 deg)
  • Deep onshore wells (Btw 10,000-15,000 ft)

Senior Drilling Supervisor / Co-man

Turkish Petroleum Corporation
05.2019 - 05.2020
  • Managing all drilling and completion activities
  • Working as Drilling Supervisor at onshore HPHT, deep and horizontal wells
  • Deep onshore wells (Btw 10,000-16,000 ft)
  • Deep horizontal well (J Type - 3500 ft horizontal section)

Drilling & Completion Supervisor / Co-man

ARAR Oil & Gas Inc.
06.2018 - 05.2019
  • Managing all drilling and completion activities
  • Working as Drilling & Completions Supervisor at onshore HP gas wells
  • Deep onshore wells (Btw 10,000-16,000 ft)
  • Drill slim hole wells (5" - 3 ½" hole)

Drilling & Completion Supervisor / Co-man

PETOIL
12.2017 - 05.2018
  • Coil Tubing Barefoot Drilling
  • (MPD) Managed Pressure Drilling
  • MPD system was used in 17-1/2" section at early kick detection mode in 12-1/4" section at Constant Bottom Hole Pressure Mode to eliminate ECD effect with 19.5ppg mud
  • (PMCD) Pressurized Mud Cap Drilling, PMCD Method was used in 8-1/2" section to drill Jeribe, Dhiban and Euphrates Formation to reach to 7" casing point
  • Production water was used as sacrificial fluid
  • Managing all drilling and completion activities
  • Chia Surkh Project / Kurdistan Region of Iraq (HPHT and deep wells, 18,6 - 19,2 ppg)
  • Single String - Dual Zone - Selective Completion

Drilling Supervisor / Co-man

SAFIR
09.2016 - 12.2017
  • Managing all drilling and completion activities

Drilling Supervisor / Co-man

Turkish Petroleum Corporation
12.2013 - 08.2016
  • Managing all drilling and completion activities
  • Gulcihan-2 Well - Exploration well - Jack-up rig - 16400 ft
  • Offshore project-shallow water-HPHT well (15000 psi) in Mediterranean Sea (3000 HP Rig)
  • Northern Marmara Offshore Gas Storage Project/Turkey
  • Juma/Bashikurd Field Development/Afghanistan (2000 HP Rig) (HPHT Well)
  • Various Drilling Projects/ Kurdistan Region of Iraq

Drilling Supervisor / Co-man

Turkish Petroleum Corporation
03.2008 - 12.2013
  • Managing all drilling and completion activities
  • Istranca-1 well - Exploration well - Jack-up rig - 12000 ft
  • Offshore project-shallow water-HPHT well in Black Sea
  • Akcakoca-5 - Production well - Jack-up rig - 5750 ft
  • Offshore project-shallow water-in Black Sea
  • Yuvaköy-1 Well (23,675 ft) - Deepest well in Turkey
  • Working as Drilling Supervisor at more than 30 onshore wells in South Eastern part of Turkey
  • HPHT Wells, 1500-2000 HP Rigs
  • Deep onshore wells (Btw 10000-16000 ft)

Junior Drilling Supervisor / Co-man

ARAR Drilling Company
07.2007 - 02.2008
  • Managing all drilling and completion activities
  • Working as Drilling & Completions Supervisor at onshore wells in South Eastern part of Turkey

Education

B.S - Petroleum and Natural Gas Engineering

Middle East Technical University

Skills

Workflow optimization

Cost reduction

Teamwork

Computer skills

Problem-solving

Time management

Team leadership

Multitasking

Decision-making

Adaptability and flexibility

Documentation and reporting

Risk management

Certification

IWCF Well Control Certificate (Surface), 06/01/26

Affiliations

Society of Petroleum Engineers (SPE)

Personal Information

  • Citizenship: Turkish
  • Number of Children: 2
  • Date of Birth: 01/01/82
  • Marital Status: Married

Software

MS Office

Timeline

Senior Drilling & Completion Supervisor

Park Place Energy / Trillion Energy
04.2022 - Current

Senior Drilling Supervisor / Co-man

SOCAR AQS
05.2020 - 04.2022

Senior Drilling Supervisor / Co-man

Turkish Petroleum Corporation
05.2019 - 05.2020

Drilling & Completion Supervisor / Co-man

ARAR Oil & Gas Inc.
06.2018 - 05.2019

Drilling & Completion Supervisor / Co-man

PETOIL
12.2017 - 05.2018

Drilling Supervisor / Co-man

SAFIR
09.2016 - 12.2017

Drilling Supervisor / Co-man

Turkish Petroleum Corporation
12.2013 - 08.2016

Drilling Supervisor / Co-man

Turkish Petroleum Corporation
03.2008 - 12.2013

Junior Drilling Supervisor / Co-man

ARAR Drilling Company
07.2007 - 02.2008

B.S - Petroleum and Natural Gas Engineering

Middle East Technical University
Gökhan SolakSenior Drilling & Completions Supervisor