Summary
Overview
Work History
Education
Skills
Training
References
Certification
Have fun with my family and fishing
Timeline
Generic

Hasan DEMÜR

Survey Chief - Survey Engineer
Giresun

Summary

Dam projects (hydroelectric power plant)-Road Projects- infrastructure construction and necessary revision according to consultant direction and built benchmark network with high accuracy.

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.

Hardworking and ready to help team achieve company goals.

Overview

2025
2025
years of professional experience
7
7
years of post-secondary education
3
3
Certifications
3
3
Languages

Work History

Survey Chief

Ozka Construction S.L.R.
8 2022 - 09.2024
  • Company Overview: Rehabilitation of R34 Hincesti - Leova - Cahul - Giurgiulesti Road Lot 1: km 0+000 to km 42+200 Lot 2: km 42+200 to km 83+000
  • Establishing the Geodesic Network, Benchmark adjustments and leveling adjustments
  • Design service/diversion roads, and ditches of project, quantity calculation of all type
  • Site control, team management and coordination with others subcontractors companies which works at site. Preparing the official protocols
  • Rehabilitation of R34 Hincesti - Leova - Cahul - Giurgiulesti Road Lot 1: km 0+000 to km 42+200 Lot 2: km 42+200 to km 83+000

Founder Partner

Kale Group Project Construction Engineering Architecture Industry and Trade Ltd. Co.
01.2021 - 08.2022
  • Company Overview: Providing consultancy, project and mapping services to construction companies for road, dam, stream rehabilitation, superstructure projects before and after construction
  • We provided that survey equipments, all kind of data such as cross section profile and quantity calculation as client's directions variable formats


Survey Chief

KIZILEV REGULATOR AND HPP
07.2019 - 12.2020
  • Company Overview: Located within the borders of Aydındere town in Bulancak District, the project has a capacity of 14.80MW
  • All type data preparing and management start of the work to end
  • Hydraulic structures, 3080m long concrete-coated NATM tunnel, 75m long loading pool, and 185m long forced pipe and power plant building. Jul 2019 - Dec 2020

Survey Chief

Özka Construction Inc.
07.2018 - 07.2019
  • Company Overview: Within the scope of the Kovanlık HPP Project, there are Hydraulic Structures, 9570m long TBM tunnel, Loading pool, 180m deep 4.30m diameter shaft manufacturing, 858m NATM tunnel, and Power plant building constructions
  • All type data preparing for site usage and managing the survey team
  • Control surveying, setting up the first Geodesic network and the maintenance of the network


Survey Chief

Yurt-se Construction Ltd. Co.
12.2012 - 07.2018
  • 1 - Giresun - Inişdibi - Batlama 0+000 to 23+600 Km road construction work, Project implementation, Plan Revisions, Culverts and Underpasses redesign and relocate, and Final Account Preparation
  • 2 - (Unye-Niksar) Junction - Korgan Provincial Road Construction work 0+000 - 45+500 Km road construction work - Project implementation, Plan Revisions (such as widening & junctions), and Final Account Preparation
  • 3 - (Iyidere - Çayeli) - Güneysu Divided Road Km: 0+000 - 9+066.40 and Güneysu Separation work - Final Account Preparation
  • 4 - Şaplıca Dam and Relocation Road Work
  • 5 - Çamoluk Gücer Dam Construction Work
  • 6 - Aktepe Dam Construction Work
  • 7 - Gelen HPP and Hydraulic Structures Construction Work
  • 8 - Ordu Civil Stream Rehabilitation
  • 9 - Sinop Ayancık Stream Rehabilitation Work

Survey Chief

Alperen Construction
04.2011 - 12.2012
  • Company Overview: Muğla Kavakçalı HPP Project with a capacity of 10 MW in Muğla province
  • All type data preparing and management start of the work to end


Survey Chief

Alperen Construction, Akfen Holding
08.2009 - 04.2011
  • Company Overview: Karaman Günder HPP Project with a capacity of 30 MW
  • All type data preparing and management start of the work to end


Survey Chief

OZYURT CONSTRUCTION LTD. STI
06.2007 - 11.2008
  • Company Overview: Excavation works of the Hydraulic Structures, Transmission channel, Loading pool, and Power plant building within the scope of the Bridgehead HPP construction in Siran district of Gümüşhane province
  • All type data preparing and management start of the work to end


Survey Engineer

Himmet-Infrastructure Joint Venture
06.2006 - 06.2007
  • Initial facility Cadastre works of various villages connected to Keşap-Espiye districts of Giresun province
  • At the same time as a site engineer, all stake out works and site management

Education

Geodesy and Photogrammetry Engineering -

YILDIZ Technical University
09.2002 - 06.2006

High School - undefined

Giresun Y.D.A High School
09.1999 - 06.2002

Skills

Autocad

Training

  • Autocad Civil 3D Basic Training, Prota Computer and Engineering, 05/01/14, 07/31/14
  • Power Civil Ss3, Ankara IMO, 05/01/16, 06/30/16
  • Netpro Training, Netcad, Bilkent, ANKARA

References

References can be provided upon request.

Certification

Autocad Civil 3D

Have fun with my family and fishing

I prefer to spend my free time with my family. I have 2 daughters. My older daughter is 9 and my younger daughter is 4 years old. We love having fun with my wife and daughters. We travel together and organize fun activities.

Timeline

Founder Partner

Kale Group Project Construction Engineering Architecture Industry and Trade Ltd. Co.
01.2021 - 08.2022

Survey Chief

KIZILEV REGULATOR AND HPP
07.2019 - 12.2020

Survey Chief

Özka Construction Inc.
07.2018 - 07.2019

Netcad Netpro

03-2016

Power Civil Ss3

04-2015

Autocad Civil 3D

03-2015

Survey Chief

Yurt-se Construction Ltd. Co.
12.2012 - 07.2018

Survey Chief

Alperen Construction
04.2011 - 12.2012

Survey Chief

Alperen Construction, Akfen Holding
08.2009 - 04.2011

Survey Chief

OZYURT CONSTRUCTION LTD. STI
06.2007 - 11.2008

Survey Engineer

Himmet-Infrastructure Joint Venture
06.2006 - 06.2007

Geodesy and Photogrammetry Engineering -

YILDIZ Technical University
09.2002 - 06.2006

High School - undefined

Giresun Y.D.A High School
09.1999 - 06.2002

Survey Chief

Ozka Construction S.L.R.
8 2022 - 09.2024
Hasan DEMÜRSurvey Chief - Survey Engineer