HSE LOTO COORDINATOR- Electrical Commissioning HSE

TECNICAS REUNIDAS
6 2023 - 1 2024
  • Performing HSE checklist for first energization and participate energization
  • Verifying LOTO prodecure with PTW system for electrical works
  • Perform electrical inspection for all temporary site panels at project and mobilization site
  • Review method of statement,JSA for electrical works
  • The LOTO Coordinator will be the acting Tagging Authority who ensures that all Construction / Startup activities requiring Energy Isolation Permits are executed safely in accordance with the Energy Isolation Management Procedure
  • The LOTO Coordinator will ensure that the equipment/system safety protective measures are in place prior to the start of the identified work and are removed after the work is completed
  • Work with Training department to ensure personnel training program for the isolation of hazardous energy is current and complies with the LOTO program requirements
  • Order and maintain material inventory (Lock Boxes, Locks, Tags, etc.) necessary for the effective implementation of the LOTO program
  • Provide guidance and direct project personnel on the implementation of the LOTO program
  • The LOTO Coordinator will maintain a high level of coordination with the client and existing plant operations personnel
  • Work hours as required, including overtime, weekends and holidays as necessary to support the project
  • Prepare status reports and give LOTO training presentations to management, client personnel and others as directed
  • Perform other duties as directed in support of project activities.

Electrical Maintenance Manager

TİM ENDUSTRI
02.2021 - 04.2023
  • Rehabilitation of Steel Iron Factory
  • Maintenance of Unit auxiliary and Dry power transformer,156kV Substation, Maintenance of MV and LV panels
  • MV-LV cable pulling and termination Works.

O&M Electrical Engineer (On site Technical Support)

SCHLUMBERGER (SLB
02.2023 - 01.2023
  • Act as a technical lever, responsible of designing the Electrical system required to operate facility projects
  • Review and understand client specifications during proposal phase
  • Raise clarifications and deviations not inline with Company standards
  • Create or review the electrical design basis and project specifications
  • Provide technical requirement for electrical equipment and preliminary MTO’s for electrical bulk material during proposals
  • Perform technical bid analysis on quotes received from supply chain
  • Provide inputs to other disciplines during project execution
  • Participate in engineering meetings
  • Responsible to deliver electrical engineering documents as per project schedule and in accordance to project budget
  • Able to design and specify the grounding, lighting, atmospheric protection and cathodic protection systems
  • Develop the electrical load balance and hazardous area classification drawings considering other disciplines inputs
  • Perform or review, comment and approve electrical studies
  • Develop all electrical detail drawings during project execution
  • Review, comment and approved all outsourced electrical engineering
  • Review, comment and approved all electrical equipment vendors’ documentation
  • Lead and assist junior electrical engineers/designers when developing engineering deliverables.

Construction Electrical and I&C Manager

GAMA POWER SYSTEM
01.2020 - 01.2020
  • Unit auxiliary and Dry power transformer instalation and electrical works
  • Grounding and lightning works installations
  • Installation of MV &LV Switchgear
  • Power&Control cable pulling and Terminations Work
  • Scada System, MV/LV and instrument cable pulling and termination works
  • Grounding Measurement
  • Instrument calibration works
  • Instrument installation Works.

Construction Electrical Supervisor

TSGI MI SOCAR TURKEY AEGEAN REFİNERY
03.2016 - 12.2019
  • Supervising the construction of electrical activities at site
  • Inspecting and reviewing projects to monitor compliance with building and safety codes and other regulations
  • Ensuring that all the activities at site are as per the project standards
  • Monitoring job progress and ensure quality work at targeted schedule
  • Liaising and coordinating with other departments on project issues
  • Electrical Installation and Pre-Commissioning Works
  • Underground earthing works
  • Step-up/step-down transformer
  • MV/LV Switchgear
  • UPS system
  • Generators
  • Fiber optic, communication and fire alarm system cable pulling and termination works
  • Busbar Power Distribution
  • Installation of Power Transformers
  • Installation of MV &LV Switchgear
  • Power&Control cable pulling and Terminations Work
  • Scada System
  • IR Test
  • CT-VT Testing
  • Transformer Testing (Buchholz,OLTC,Oil BDV) ATS/MTS Test
  • Interlock-Intertrip test with Vendors
  • Scada Fiber Optic Testing
  • Grounding Measurement.

Electrical Superintendent

RENAISSANCE HEAVY INSDUSTRIES
04.2019 - 10.2019
  • Responsible of all electrical works at site and purchasing all electrical project equipment and materials
  • Cable Tray installation works
  • Transformer installation works
  • MV and LV switchgear installation works
  • Cable pulling and termination works.

SEC PP 13 1800MW Combined Cycle Power Plant Electrical QA/AC Engineer

GAMA POWER SYSTEM
02.2016 - 03.2016
  • Responsible for QA/QC and all documentations
  • Preparation for electrical Inspection test plan, Method Statement and procedure
  • Performing inspections of all electrical work in progress
  • Coordinate with quality inspections with all the site sub contractors.

Construction Site Engineer

GAMA POWER SYSTEM
04.2014 - 01.2016
  • Khabat Thermal Power Plant Unit 1 &2 and 400kV Bazyan Substation
  • Site Mobilization Works (MV Kiosk Installation, mv cable pulling and termination works, LV distribution works)
  • Underground works for cabling
  • 132kV Siemens Switchyard Installation (CT,VT,Circuit Breaker,Surge Arrester DS,DS-ES)
  • Step-up/step-down transformer(15.75kV/132kV)
  • Unit auxiliary and Dry power transformer installation and electrical works
  • Generator circuit breaker installation
  • Grounding and lightning works installations
  • Fiber optic cable pulling and testing
  • Siemens Sgen5-100A-2P Turbogenerator Installation and periodic electrical testing
  • DCS cabinet installation
  • Boiler instrument cabinet installation works
  • Instrument calibration laboratory management (instrument calibration and installation works)
  • Cooling towers electrical and instrumentation works
  • FGD facilities electrical works
  • Electrostatic P
  • Installation.

Electrical QA/AC Engineer

GAMA POWER SYSTEM
09.2013 - 01.2014
  • Responsible for QA/QC and all documentations
  • Performing inspections of all electrical work in progress
  • Coordinate with quality inspections with all the site sub contractors.

Construction Site Engineer

GAMA POWER SYSTEM
08.2012 - 01.2014
  • DISI, Mudawarra-Amman Water Conveyance System
  • Step-up/step-down transformer
  • MV/LV Switchgear
  • UPS system
  • Generators and fuel-oil system
  • Chlorination system
  • Communication system
  • Well pumps
  • MV/LV cable pulling and termination works
  • Fiber optic, communication and fire alarm system cable pulling and termination works.

Construction Site Engineer

DESAT Elektrik Mekanik A.Ş.
01.2012 - 05.2012
  • Ant Yapı, Renova Residental Complex Sochi Rooms, 3600 Rooms 3 and 4 star Hotel, Apart Hotel, Administrative Buildings Sport Complexes and Social Facilities
  • Electrical Works (Power and Control Cabling Infrastructure, Low voltage system cabling, Power System Cabling, Lighting System Cabling).

Construction Site Engineer

DESAT Elektrik Mekanik A.Ş.
06.2010 - 01.2012
  • Avrasya Metro Group Joint Venture-Kadiköy-Kartal Rail Public Transportation System
  • Step-up transformer
  • MV & LV System
  • MV &LV Switchgear
  • Power&Control cable pulling and Termination Work
  • 1500Vdc Rigid Catenary System Installation, cabling and termination works
  • Escalator System Electrical Works
  • Elevator system Electrical Works
  • Busbar Power Generation
  • Low voltage System Electrical Works.

Education

Electrical and Electronics Engineering -

European University of Lefke

undefined

Luleburgaz Anatolian High School

undefined

Corlu Trakya College

Skills

Autocad

MS Office

Ms Project

Certification

Autocad 2D&3D (Bilişim Eğitim Akademisi-2011)

Place

Çandarlı Mah.Ferhat Uysal cad.Ayten hanım Konakları 14/2A A-2, Dikili, İZMİR

Maritalstatus

Single

Phone1

(+90) 538 017 54 90

Interns

  • Zorlu Linen Tekstil A.Ş. (07-09/2007 -Electrical Maintenance Department
  • Zorluteks Tekstil Ltd.Şti. (06-08/2008) -Electronic Maintenance Department
  • Trakya Cam Sanayi A.Ş. (08-09/2008) -Electrical Maintenance Department

Military Service

Done 2010

Driverlicense

Class B -2006

Personal Information

Date of Birth: 11/25/1985

References

  • Jose Diego Rizo Bermudez, HSE Manager -SASA PTA Project/ADANA/ TURKEY, +34 661 75 01 61
  • Juan Pablo Gómez Álamo, HSE Manager -SASA PTA Project/ADANA/ TURKEY, +34 686 63 54 09, jpgomez.prevencion@gmail.com
  • Hüseyin Pehlivan, HSE Superintendent, +90 549 574 53 90
  • Salvatore Fornai Saipem, Electrical Comm.Superintendent
  • Recep Caliskan, Gama Power System/Haldiz Insaat A.S. Electrical Superintendent, +90 532559 41 41
  • Sezer ELOL, GAMA POWER SYSTEM Qa/Qc Manager, +90 05384 979 91 21
  • Mustafa Ufuk ŞENARAS, Former Electrical Manager İDÇ-Technical Advisor of TİM ENSDUSTRI, 05327146098
  • Ufuk Candar, FOYA ENERGO-PRO Türkiye Elektrik İşleri Koordinatörü / Electrical Works Coordinator, +90 312 4680057, +90 533 4756893
  • Zennure YENER, ICA İçtaş-Astaldi 3.Boğaz Köprüsü ve Otoyol Projesi Elektromekanik Koordinatörü, 05346440479

Timeline

O&M Electrical Engineer (On site Technical Support)

SCHLUMBERGER (SLB
02.2023 - 01.2023

Electrical Maintenance Manager

TİM ENDUSTRI
02.2021 - 04.2023

Construction Electrical and I&C Manager

GAMA POWER SYSTEM
01.2020 - 01.2020

Electrical Superintendent

RENAISSANCE HEAVY INSDUSTRIES
04.2019 - 10.2019

Construction Electrical Supervisor

TSGI MI SOCAR TURKEY AEGEAN REFİNERY
03.2016 - 12.2019

SEC PP 13 1800MW Combined Cycle Power Plant Electrical QA/AC Engineer

GAMA POWER SYSTEM
02.2016 - 03.2016

Construction Site Engineer

GAMA POWER SYSTEM
04.2014 - 01.2016

Electrical QA/AC Engineer

GAMA POWER SYSTEM
09.2013 - 01.2014

Construction Site Engineer

GAMA POWER SYSTEM
08.2012 - 01.2014

Construction Site Engineer

DESAT Elektrik Mekanik A.Ş.
01.2012 - 05.2012

Construction Site Engineer

DESAT Elektrik Mekanik A.Ş.
06.2010 - 01.2012

HSE LOTO COORDINATOR- Electrical Commissioning HSE

TECNICAS REUNIDAS
6 2023 - 1 2024

Electrical and Electronics Engineering -

European University of Lefke

undefined

Luleburgaz Anatolian High School

undefined

Corlu Trakya College
Autocad 2D&3D (Bilişim Eğitim Akademisi-2011)
English Education (British Time-2011)
Electrical High Voltage Facilities Management Instructor (Chamber of Electrical Engineers-2010)
High Voltage Engineering (European University of Lefke -2009)
Power Sytem Engineering (European University of Lefke -2009)
IOSH Safely Management DOGA SAFETY British Safety (2015 November)
Advanced and Safe Techniques Course PROSMER (2015 August)
Boğaziçi University Online English Course University Plus , (2015 November )
Atex 2014/34/AB CERTA (2016)
Certificate of Appreciation -TSGI 2018
Cem METE