Summary
Overview
Work History
Education
Skills
Certification
Personal Information
Hobbies&Skills
References
Timeline
Generic
Burhan Oguzhan CELİKYAY

Burhan Oguzhan CELİKYAY

Piping&Mechanical Installation Executive
Adana

Summary

Experienced in welded manufacturing, project management, design, planning, and manufacturing processes. Proficient in overseeing all aspects of projects, from conception to completion, to ensure efficient and high-quality results. Skilled in analyzing and optimizing manufacturing processes to drive productivity and cost reduction. Committed to delivering exceptional outcomes through meticulous attention to detail and strong problem-solving abilities. Seeking opportunities to leverage expertise and contribute to the success of a dynamic organization in the manufacturing industry.

Overview

16
16
years of professional experience
9
9
years of post-secondary education
2
2
Certifications
3
3
Languages

Work History

Strategy & Investment Executive

SASA POLYESTER SANAYİ A.Ş
01.2021 - Current

Management of the following works in 1.58 million tpa capacity of Purified Terephtalic Acid Plant project;


  • 1000000 diainch piping prefabrication, installation and precommissioning activities completion in 40months
  • 6110 tons / 37pcs / 218000m3 storage tanks prefabrication, installation, painting and precommissioning activities completion in 35months
  • 19000 tons / 727pcs ( 365-static eq. , 362-rotary eq. ) equipments installation completion in 38 months
  • 76000m2 piping&equipment insulation completion in 26 months
  • Piping system CE marking based on 2014/68/EU
  • Execution of Resources ( manpower of subcontractors, site logistic equipments, lifting equipments etc. ) according to Project Schedule
  • Execution of Work Breakdown Structure for each discipline
  • Execution of Work Contractor and Subcontractors

Strategy & Investment Lead

SASA POLYESTER SANAYİ A.Ş
03.2019 - 01.2021

Management of the following works in 365000 tpa Continuous Polymerization, Partially Oriented Yarn & Drawn Texturised Yarn PLANT (Seyhan / ADANA);


  • BOQ configuration
  • Execution of Project materials procurement
  • Execution of utility air system design&supply vendor
  • Execution of chilled water system design&supply vendor
  • Execution of HVAC system design&supply vendor
  • Execution of cooling water system design&supply vendor
  • Execution of Piping&Electrical routing
  • 485000 diainch piping prefabrication, installation and precommissioning works in 48 months
  • Piping system CE marking based on 2014/68/EU
  • Execution of Resources ( manpower of subcontractors, site logistic equipments, lifting equipments etc. ) acc to project schedule

Strategy & Investment Specialist

SASA POLYESTER SANAYİ A.Ş
12.2017 - 03.2019

Management of the following works in 335000 tpa Staple Fiber and Continuous Polymerization Plant Project;


  • Piping Manhour planning&mobilization of subcontractor based on Project Schedule
  • Execution of Piping Project material procurement based on Project Schedule
  • Project Cost analysis and budget studies
  • NDT workload planning&mobilization of NDT subcontractor based on Project Schedule
  • Design controls and energy efficiency improvement Works of utility systems (steam / condensate / chiller / water / air etc.)
  • 365000 diainches piping prefabrication, installation and precommissioning activities

Piping İnstallation Lead

AKON GROUP
05.2017 - 12.2017

Management of the following works in TÜMAD Gold Fertilizer Plant Project


  • Piping Workshop Installation
  • Piping weldmap & weldlog preparation
  • Fluid services base, location based, precommissioning loop based piping progress follow-up and execution
  • Execution of piping prefabrication, installation and precommissioning works based on commissioning priority plan
  • Execution of piping support prefabrication and installation based on commissioning priority plan
  • Execution of piping project material procurement based on commissioning priority plan
  • Execution of manpower mobilization/demobilization based on project schedule
  • Welding consumables calculation and procurement
  • Piping pressure test packages preparation and performing
  • Execution of Storage Tanks installation based on API650 specification

Piping Group Engineer

Renaissance Heavy Industries
09.2016 - 03.2017

Execution of the following works in Zap-sib Etyhlene Cracker Unit&PE-PP Plant Project;


  • Planning and performing of 150000 dainch piping installation
  • Manhour planning and mobilization/demobilization of installation teams based on weekly&monthly workfront
  • Execution of piping subcontractor based on weekly installation targets

Quality Control Engineer

Renaissance Heavy Industries
04.2016 - 09.2016

Execution of the following works in Kuybishevazot NH2/NH3 Plant Project;


  • Performing of QA/QC punch closing and releasing piping pressure test packages based on Commissioning priorities
  • Decreasing of NDT backlog
  • Performing of 250000 diainch piping reinstatements
  • Performing of 5000 tons of Static and Rotating Equipment Final İnspections

Quality Control Engineer

Renaissance Heavy Industries
11.2015 - 04.2016

Performing of the following works in Phosagro Ammonia Plant Project;


  • Execution of piping NDT (VT – RT – UT – PT – MT) based on weekly workfront of Project Schedule
  • Execution of PWHT ( Post Weld Heat Treatment ) based on weekly workfront of Project Schedule
  • WPS&PQR preparation based on GOST specification
  • Management of Site Quality Inspectors

Spiral Welded Steel Pipe Manufacturing Engineer

NOKSEL ÇELİK BORU In. Co.
11.2014 - 11.2015

Performing of the following works in Noksel Çelik Boru In. Co. ;


  • Planning and execution of Spiral Welded Steel Pipe Manufacturing according to petroleum, gas, water and piling pipeline specifications (API 5L, EN 10208, EN 10217 – 1, EN 10219, ASTM A – 252 )
  • Execution of TANAP ( Trans Anatolian Natural Gas Pipeline ) Project pipeline manufacturing with a consortium of Borusan Mannesman&Erciyas&Noksel
  • WPS-PQR preparation based on ASME SEC IX, EN15609, EN15614

Site Engineer

Sekural Construction Industry
06.2014 - 11.2014

Performing of the following works in Divan Hotel Project;


  • Following up the facade project installation schedule
  • Planning of Daily/Weekly/Monthly installation schedule
  • Reaching the target of progress payment
  • Manpower execution and Providing of Project Resources

Internship

Koluman Automotive Industry
08.2012 - 08.2012
  • Manufacturing process planning and management

Internship

Koluman Automotive Industry
08.2011 - 09.2011
  • Frame installations and assembly of products which are the followings;

- cargo class curtained trailer

- dump trailer

- flatbed trailer

- solo tanker

- trailer tanker

- concrete pump

- sweeper


Internship

BOSSA
08.2009 - 09.2009
  • Manufacturing process of various denim fabric collections
  • Quality control process of denim fabrics

Swimming Coach

Mersin Büyükşehir Sports Club
08.2009 - 08.2012
  • Teaching of crawl, butterfly, backstroke, breaststroke swimming techniques to children from the ages of 5 to 16

Education

IWE ( International Welding Engineering ) - Welding Technology

GSI SLV-TR Middle East Technical University
Ankara, Turkey
06.2013 - 10.2013

Mechanical Engineering -

Suleyman Demirel University
10.2009 - 06.2013

Textile Engineering - undefined

Suleyman Demirel University
09.2007 - 10.2009

Science - undefined

Pakize Kokulu High School
09.2003 - 06.2006

Skills

Swimming

Scuba Diving

LifeGuard

Triathlon

Skiing

Solidworks

Certification

GSI SLV-TR International Institue of Welding, International Welding Engineering Course

Personal Information

  • Date of Birth: 05/14/89
  • Gender: Male
  • Nationality: Turkey
  • Driving License: B
  • Marital Status: Married
  • Military Task: Completed

Hobbies&Skills

  • Swimming
  • Scuba Diving
  • LifeGuarding
  • Triathlon
  • Skiing

References

1- Ahmet TEKGUL / TUVSUD Industry Service Division Deputy Manager 

  Mobile: +90 532 663 72 44 

  E-mail: ahmet.tekgul@tuvsud.com


2- Mustafa ORMECI / TUVSUD Local Head of NoBo Representative 0036

  Mobile : +90 533 257 04 39

  E-mail: mustafa.ormeci@tuvsud.com


3- Tarhan ALACAM / TUVSUD Executive Consultant

  Mobile: +90 532 455 23 97

  E-mail: tarhan.alacam@tuvsud.com


4- Ozer ARAS / Sonmez Global Company QA/QC Manager

  Mobile: +90 545 860 18 60


5- Kadir BICER / USTAY Construction Company QA/QC Manager

  Mobile: +90 532 546 42 68


6- Ozgur YAVAS / Steel Trader

  Mobile: +90 533 656 53 68


7- Oguzhan YERLITAS / Akon Grup Project Manager

   Mobile: +90 532 161 71 81


8 - Aydın YILDIRIM / Renaissance Heavy Industries Project Manager

   Mobile: +90 533 697 36 42





Timeline

Strategy & Investment Executive

SASA POLYESTER SANAYİ A.Ş
01.2021 - Current

Strategy & Investment Lead

SASA POLYESTER SANAYİ A.Ş
03.2019 - 01.2021

Strategy & Investment Specialist

SASA POLYESTER SANAYİ A.Ş
12.2017 - 03.2019

Piping İnstallation Lead

AKON GROUP
05.2017 - 12.2017

TWI CSWIP 3.1 International Welding Inspector Course

01-2017

Piping Group Engineer

Renaissance Heavy Industries
09.2016 - 03.2017

Quality Control Engineer

Renaissance Heavy Industries
04.2016 - 09.2016

Quality Control Engineer

Renaissance Heavy Industries
11.2015 - 04.2016

Spiral Welded Steel Pipe Manufacturing Engineer

NOKSEL ÇELİK BORU In. Co.
11.2014 - 11.2015

Site Engineer

Sekural Construction Industry
06.2014 - 11.2014

GSI SLV-TR International Institue of Welding, International Welding Engineering Course

10-2013

IWE ( International Welding Engineering ) - Welding Technology

GSI SLV-TR Middle East Technical University
06.2013 - 10.2013

Internship

Koluman Automotive Industry
08.2012 - 08.2012

Internship

Koluman Automotive Industry
08.2011 - 09.2011

Mechanical Engineering -

Suleyman Demirel University
10.2009 - 06.2013

Internship

BOSSA
08.2009 - 09.2009

Swimming Coach

Mersin Büyükşehir Sports Club
08.2009 - 08.2012

Textile Engineering - undefined

Suleyman Demirel University
09.2007 - 10.2009

Science - undefined

Pakize Kokulu High School
09.2003 - 06.2006
Burhan Oguzhan CELİKYAYPiping&Mechanical Installation Executive