Accomplished Maintenance & Utilities Manager with a proven track record at BRF, adept in strategic planning and operations management. Excelled in implementing predictive maintenance, enhancing energy management by 20%, and leading teams with a focus on continuous improvement. Skilled in SAP/PM and team leadership, my approach significantly boosts efficiency and sustainability.
SAP/PM maintenance system installation and management
Defining and implementing planned maintenance processes
Implementing Kanban visual management system (Workforce planning over 60%)
5S improvements
Root cause analysis
Failure analysis
Target and action monitoring
Budget reporting and forecasts
ORACLE purchasing process monitoring
PDCA creation practical and theoretical personnel training
KPI monitoring with Pareto charts (Reduce downtime percentage from 6.3% to 1.1%)
Quality management FSSC 22000, ISO 9001:2015 KPI Tracking,
target control
Fault resolution (MTTR, MTBF process management)
Periodic service maintenance
Technical purchasing
Creating machine maintenance plans
Predictive maintenance activities
Preventive maintenance activities
Employee training
Pneumatic and hydraulic system maintenance
Setup and followed projects;
• 2017 - Dohler Food - Karaman 35 Tons/H 13 Barg Fluidized Bed Boiler - Project Management
• 2017 - Cms Textile - Kahramanmaraş 7.000.000 Kcal Hot Oil Boiler - Project Follow-Up
• 2017 - Sanko Superfilm - Gaziantep 10.000.000 Kcal Hot Oil Boiler - Project Follow-Up
• 2017 - Oyka Paper - Zonguldak Soda Boiler Economizer Replacement - Project Management
• 2018 - Siyazen Broiler - Azerbaijan13 Tons/H 8 Barg - Scotch Boiler - Project Management
• 2018 - Lutuf Mensucat - Kahramanmaras 8 Tons/H 8 Barg - Scotch Boiler - Project Management
Agricultural Machinery and Spare Parts Production (domestic and export) As a Production and Quality Engineer; I took part in the machining and chipless manufacturing process.
Machines
* CNC Lathe
*Torna
*Industrial Cutting (Plasma Cutting)
*Vertical Machining ( Freezing )
*Planya
*Ton Press
*Induction Oven
*Submerged Arc Welding
I used the following programs;
*Solidworks
*Autocad
*Mastercam 3D
*Microsoft Office Excel
*Microsoft Office Word
*Micro V14 (Accounting Program)
Telecommunication Machinery and Equipment
Informatics Machinery and Equipment
Team Leadership
Strategic Planning
Budget Control
Performance Evaluations
Workplace Safety
AutoCAD
Microsoft Excel
SolidWorks 3D models
Energy management systems
Energy Manager Certificate, Ministry of Energy and Natural Resources
In Banvit SAP/PM module;
SAP Introduction
Work Center
Functional Locations
Equipments
BOM
Notification Creation&Service Order unplanned Confirmation Tasklist
Maintenance Plan Service Orders Creation- Planned Warehouse request v2
Activities planning (Kanban)
Kanban Std Format
OPERATIONAL CHECKLIST
Materials Management
1,800 kwh/h recovery (25 tons of hot water recovery from 15°C to 80°C) with the “ Tube Exchanger” project for waste steam from Batch Cookers used in rendering plants.
Energy Manager Certificate, Ministry of Energy and Natural Resources
Natural Gas Fired Heating Igniter, Ministry of National Education, 32 hours of training
Process and Automation Control Activities, KROHNE Academy, 10 hours of training
LPG Autogas Station / Filling Plant Responsible Manager, Chamber of Mechanical Engineers, 20 hours of training
Solid and Liquid Fuel Heating Igniter, Ministry of National Education, 64 hours of training
Pro engineer, Inonu Univercity
Geothermal Energy and Electricity Generation from Geothermal Energy, Inonu Univercity, 80 hours of training