

I have been working in construction sites and project offices since my high school years. I have been in the field for 10 years and I have been an engineer for 5 years.
-Termination and commissioning at Gölcük Submarine Shipyard within the scope of the MİLGEM project
-EMAAR Square termination and commissioning
-Termination and commissioning, cabinet transfers and maintenance works at the TürkTelekom main building
Within the scope of Fatih Project, establishment of electrical and signaling infrastructure of 151 schools in Manisa and revision of school interiors
I provided engineering services in various international projects within AYC Engineering.
The main projects are:
-Financial Center as-build revisions and surveying
-BETA Transformer Factory; Factory Building, Administrative Building and Personnel Building
-Lion Stone Art Factory; Factory Building and Administrative Building
-Urla Hotel Management; Project design and field engineering
-Petkim Haor Project; Fire detection and emergency announcement systems
-Heydar Aliyev Refinery; Unit 817 power system analaysis and ETAP reports
-Ruba Fermuar Manisa, 1.8MW Rooftop Solar Power Plant Installation and Commissioning
-Vatan Kablo Çorlu/Tekirdağ 5.2MW Rooftop Solar Power Plant Installation and Commissioning
-Turkcell European Data Center, phase 2 system rooms electrical and mechanical termination and commissioning
-Kocaeli Municipality Barrier-Free Life School Termination
-Sepetçi/Kocaeli 1700 housing Toki project
Number 4 Coke Coal Battery, termination and commissioning engineer
Project Management
Power Systems Analysis
Microsoft Office
AutoCAD
AutoCAD Navis
Dialux
ETAP
Matlab
Proteus ISIS