During my internship, I observed regional water projects.
I independently designed a comprehensive irrigation project for an agricultural area.
This included planning and drafting the main canal and auxiliary channels using AutoCAD.
I conducted on-site observations to assess the terrain and coordinated land consolidation strategies to optimize water distribution.
From initial planning to final drawings, I was responsible for all stages of the project.
I also calculated the bill of quantities and prepared detailed measurements, gaining valuable hands-on experience in both technical drawing and project execution within the field of hydraulic engineering.
Intern
Köroğlu Yapı Denetim
07.2023 - 08.2023
During my internship, I checked the stages of the structures and observed the stages the project went through in the municipalities.