Summary
Overview
Work History
Education
Skills
Projects
Courses
References
Timeline
AdministrativeAssistant
Aykut Karaca

Aykut Karaca

Industrial Engineering
Gaziemir,İzmir

Summary

I am a fourth-year Industrial Engineering student at Abdullah Gul University with a 2.93 GPA, aiming to excel in planning, process development, and auditing. Through internships and projects, I've gained hands-on experience in production optimization, project management, and supply chain analysis. Fluent in Turkish and English, I possess strong analytical and problem-solving abilities, particularly in using advanced tools like MS Office, GAMS, Python, and SIMIO. I am eager to leverage these skills to contribute effectively in the field of industrial engineering.

Overview

2
2
years of professional experience
8
8
years of post-secondary education
2
2
Languages

Work History

Thesis Project Intern

KIM Technology
Kayseri, 38
11.2023 - 6 2024
  • For thesis project, completed internship adventure that lasted approximately 8 months at KIM Technology together with 3 team members
  • Actively participated in brainstorming sessions for concept development and idea generation, bringing fresh perspectives to established processes
  • Applied problem-solving skills to resolve unexpected challenges that arose during ongoing projects swiftly and efficiently
  • Produced professional reports, documents and presentations for project needs

Project Management Intern

Eldor Corporation
Izmir, 35
07.2023 - 09.2023
  • 40-day internship has been completed at Eldor Corporation, automotive sector company in Aegean Free Zone
  • Project "Minimization of the Project Box" was completed, contributing to increase in efficiency
  • Interface using Python was designed and presented for sustainability and feasibility of project.
  • Worked with senior project managers to assist with day-to-day functions.

Project Intern

Odul Trophy
02.2023 - 06.2023
  • 3 different projects were completed with 3 colleagues at Odul Trophy company located in Kayseri Organized Industrial Zone
  • Interfaces were designed using Excel VBA to increase applicability of projects.
  • Collaborated with team members to develop innovative solutions, resulting in increased overall project effectiveness
  • Participated in creation and maintenance of project tracking tools, verifying clear communication of inherent expectations and responsibilities.
  • Produced professional reports, documents and presentations for project needs

Project Intern

Yataş
Kayseri, 38
10.2022 - 01.2023
  • With 2 teammates worked on "capacity planning" project for CNC sponge cutting machines for about 4 months and interface program was created to realize project
  • Actual and up-to-date production flow in sponge factory was transferred to program called SIMIO, and realistic 3D modelling of production was with realistic data.
  • Applied problem-solving skills to resolve unexpected challenges that arose during ongoing projects swiftly and efficiently

Production Intern

Meko Metal (KMC GROUP)
06.2022 - 08.2022
  • Completed 40-day production internship at Meko Metal, profile production factory of KMC Group in Torbalı, Izmir
  • Managed and completed comprehensive 5S project on pipe profile lines.
  • Developed strong communication skills through regular interactions with supervisors, peers, and other department personnel

Project Intern

Ergül Furniture
02.2022 - 06.2022
  • As project intern at Ergül Furniture's factory in Kayseri OSB, two separate projects were completed
  • In first project on mass production line, lean production techniques were applied, and in second project, mathematical model was developed for automatic fabric cutting machine to minimize fabric cutting.
  • Analyzed root causes of defects using statistical tools such as Pareto charts, control charts, and fishbone diagrams

Project Intern

Simfer
Kayseri, 38
09.2021 - 12.2021
  • Worked as project student at Simfer's factory in Kayseri OSB, and, mathematical model was developed to solve factory problem that minimizes mold connection times.

Production Intern

Roy Robson
Izmir
6 2021 - 8 2021
  • 25-day production internship was completed at the factory of Roy Robson, which operates in textile sector, in Izmir Free Zone
  • Kaizen project was implemented during internship.
  • Developed strong communication skills through regular interactions with supervisors, peers, and other department personnel

Education

License - Industrial Engineering (English)

Abdullah Gul University
Kayseri, 38
10.2019 - 06.2024

Yalvac Science High School
Isparta, 32
10.2014 - 06.2018

Skills

MS Office Applications (Advanced)

Projects

  • Kaizen Project

Increasing employee productivity by reducing waste time.

  • Mathematical Model for Minimizing Mold Clamping Times

Minimizing the mold clamping times of press machines

  • Application of Lean Manufacturing Techniques in Mass Production Line

The 5S and Kaizen application to armchair mass production line

  • Mathematical Model to Minimize Fabric Waste on Automatic Fabric Cutting Machines

Minimizing the amount of idle fabric of the automatic fabric cutting machine.

  • 5S Project in Pipe Profile Lines

A comprehensive 5S project in 7 pipe profile lines

  • Capacity Planning in CNC Sponge Cutting Machines

Carried out on how much sponge the CNC machines could cut in the determined plan

  • Sponge Factory Production Flow Simulation

Determining bottlenecks by the production flow of sponge factory is simulated through SIMIO.

  • Inventory Management Project Using EOQ Model

Determine the optimum number of inventories in order to prevent excess stock for raw materials and to avoid costs.

  • Supplier Selection with MAUT Method

The most useful supplier was mathematically determined by considering the criteria of a certain number of suppliers.

  • Review and Analysis of Quality Control Processes

Determine whether the quality defects in the furnace production line are under control.

  • Minimizing the Number of Project Boxes Project

Aiming to use a minimum number of boxes in the boxing phase of product-based tools of machines.

  • Simulation-Based Production Optimization and Process Scheduling

Determining bottlenecks and current flow in production by simulating factory. Also, aiming to schedule production plan to determine minimum due date of orders.

Courses

  • Lean Manufacturing Engineer / Specialist Training Program
  • OKR Objective Key Results
  • Introduction to Sustainable Finance

References

  • Professor Dr. Mehmet SOYSAL, Hacettepe University Department of Business Administration, 0 (312) 290 8700 / 150, mehmetsoysal@hacettepe.edu.tr
  • Manufacturing Engineer Cem Öksüz, Roy Robson, 05549835787, cemoksz@yandex.com
  • Project Management Specialist Gözde Can, Eldor Corporation, 05533710893, gozde.can@eldor.com.tr
  • Marketing Manager Cem Buyukmıhcı, KIM Technology, 05386885588, cbuyukmihci@kimtechnologies.com.tr

Timeline

Thesis Project Intern

KIM Technology
11.2023 - 6 2024

Project Management Intern

Eldor Corporation
07.2023 - 09.2023

Project Intern

Odul Trophy
02.2023 - 06.2023

Project Intern

Yataş
10.2022 - 01.2023

Production Intern

Meko Metal (KMC GROUP)
06.2022 - 08.2022

Project Intern

Ergül Furniture
02.2022 - 06.2022

Project Intern

Simfer
09.2021 - 12.2021

License - Industrial Engineering (English)

Abdullah Gul University
10.2019 - 06.2024

Yalvac Science High School
10.2014 - 06.2018

Production Intern

Roy Robson
6 2021 - 8 2021
Aykut KaracaIndustrial Engineering