Anıl Bilen

Kocaeli/Körfez,59

Summary

Dedicated professional with extensive knowledge of mechanical technologies, tools and practices. Designs and develops equipment to improve prototypes and products. Experienced in leading projects from initial conception to completion within budget.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Project Engineer

Ford Otosan
2023.02 - Current
  • I am taking part in the establishment of the body workshop for the increase of the annual vehicle production capacity of the facility, which is planned to be built in partnership with Ford and Volkswagen, from 100.000 to 400,000 units.
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Managed budgets effectively for multiple projects, ensuring financial targets were met.
  • Evaluated new technologies for implementation into current projects, increasing overall success rates.
  • Mentored junior engineers, contributing to their professional development and enhancing team performance.
  • Coordinated cross-functional teams, fostering collaboration to achieve project goals.
  • Evaluated change order requests in response to out-of-scope work activities to all project in bodyshop.
  • Identified technical risks within managed projects.

Process Engineer

Ford Otosan
2022.02 - 2023.02


  • Paint booth, dry scrubber unit, quality control and repair areas are the areas of responsibility within the Paintshop.
  • Shift and overtime plans of the team working in the area of

    responsibility were managed.
  • Provided technical support for troubleshooting equipment issues, maintaining plant reliability and minimizing operational disruptions.
  • Within the scope of the capacity increase project of the spray booth, managing the increase in the number of robots in the booth by 33 percent.
  • Managing the revision of the dryscrabber unit of the spray booth within the scope of the capacity increase project.
  • The revision project of the waste solvent line of the spray booth, which is a chronic problem, has been completed.
  • Within the scope of the project to reduce solvent consumption, a new program revision and equipment commissioning were made.
  • Together with the maintenance team, critical spare parts stock needs were determined and the necessary spare parts were supplied.
  • Critical spare parts stock needs were determined together with the maintenance team for the departments within the area of

    responsibility and the necessary incidental and planned spare parts were supplied.

Mechanical Maintenance Engineer

Arçelik
2019.12 - 2022.02
  • Managed inventory of spare parts and tools, maintaining adequate stock levels for timely repairs.
  • Shift and overtime planning of 25 people in the facility maintenance and production maintenance team was managed.
  • Purposeful projects and improvements were managed to reduce the spare parts budget.
  • All machines in the factory's production line were evaluated for FMEA classification and periodic maintenance and spare parts stocks were revised according to the process.
  • With the coordination of the production and maintenance team, a system was established for the daily control and cleaning work orders of the machine operators in their responsible machines, and monitoring and reporting were made throughout the factory.
  • Provided technical support during installation of new equipment, ensuring proper setup for optimal functionality.
  • Increased equipment lifespan, conducting thorough preventative maintenance on machinery.
  • Risks in the production area were periodically reviewed together with the occupational health and safety (OHS) unit. Appropriate revisions were made according to the results.
  • Line revisions were made to eliminate chronic problems in the factory's compressed air line. New dryer and compressor investments were managed.
  • Within the scope of the cooling system revision, the installation and commissioning of the new chiller system was managed.
  • The revision project of the R-32 unit used as air conditioning gas was managed.
  • Compressed air measurement system has been installed and put into operation.
  • The new investment and revision process in the chiller system was managed and put into used.
  • With the team established for ISO 50001 (Energy Management System), the relevant certification was brought to the factory.
  • Planning for the development and training of the maintenance team was managed.

Project Engineer

Pirelli Türk Otomobil Lastikleri
2019.02 - 2019.12


  • Organizing and managing the spare parts stock required for the newly established truck tire production facility.
  • Drawing and supplying necessary mechanical spare parts.
  • Completing revisions in accordance with the demands of the Occupational Health and Safety (OHS) unit.
  • Managing capacity increase projects for newly installed equipment.
  • Managing machine and equipment revisions according to requests from the quality assurance department.

Energy and Budget Specialist

Migros T. A.Ş
2018.07 - 2019.11
  • Analyzing, reporting and budget monitoring of the energy consumption of Migros stores around the world.
  • Implemented zero-based budgeting techniques for improved expense tracking and reduced waste within the organization.
  • Participating in installation and cooler group design project teams established to reduce energy costs.
  • Managing the supply processes of equipment for assigned projects.

Education

Bachelor of Science - Mechanical Engineering

Istanbul Technical University
Istanbul
2017

Skills

  • Project and Schedule Management
  • Team Collaboration and Leadership
  • Health and safety compliance
  • Cost Estimation
  • Budget Development
  • Technical specification preparation
  • CAD Software
  • Mechanical Troubleshooting
  • Design concept management
  • People Management

Certification

Mechanical Maintenance Robots and Application Paint / Stutgart-DURR

Robot Programlanması 1 KSS 8.x (KRC4/KRC5)/Istanbul-KUKA

Marketing Conferance/Istanbul-ITU

Hydraulic and Pneumatic Systems/Istanbul-FESTO

Takdirin 5 Dili/Kocaeli-Ford Otosan

FMEA-Hata Türleri ve Etkileri Analizi Eğitimi/Kocaeli-Ford Otosan

Etkileme, İkna ve Etki Yaratma/Kocaeli-Ford Otosan

Languages

Turkish
Native language
English
Advanced
C1

Timeline

Project Engineer

Ford Otosan
2023.02 - Current

Process Engineer

Ford Otosan
2022.02 - 2023.02

Mechanical Maintenance Engineer

Arçelik
2019.12 - 2022.02

Project Engineer

Pirelli Türk Otomobil Lastikleri
2019.02 - 2019.12

Energy and Budget Specialist

Migros T. A.Ş
2018.07 - 2019.11

Bachelor of Science - Mechanical Engineering

Istanbul Technical University

Mechanical Maintenance Robots and Application Paint / Stutgart-DURR

Robot Programlanması 1 KSS 8.x (KRC4/KRC5)/Istanbul-KUKA

Marketing Conferance/Istanbul-ITU

Hydraulic and Pneumatic Systems/Istanbul-FESTO

Takdirin 5 Dili/Kocaeli-Ford Otosan

FMEA-Hata Türleri ve Etkileri Analizi Eğitimi/Kocaeli-Ford Otosan

Etkileme, İkna ve Etki Yaratma/Kocaeli-Ford Otosan

Anıl Bilen